Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
5T9302EJGI
Renesas
IC CLK BUFFER 2:2 450MHZ 20TSSOP

Lead Time: 9-12Days

-- --
3300
Total: $
HMTSW-104-06-T-S-080
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2500
Total: $
HMTSW-103-12-T-S-680-RA
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2200
Total: $
5T9304EJGI8
Renesas
IC CLK BUFFER 2:4 450MHZ 24TSSOP

Lead Time: 9-12Days

-- --
7300
Total: $
MTSW-102-22-T-D-330-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
5V2310PGG8
Renesas
IC CLK BUF 1:10 200MHZ 24TSSOP

Lead Time: 9-12Days

-- --
2500
Total: $
HTSW-103-24-LM-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
500
Total: $
ICS83940DYI
Renesas
IC CLK BUFFER 2:18 250MHZ 32TQFP

Lead Time: 9-12Days

-- --
9400
Total: $
HTSW-103-24-L-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8400
Total: $
851010AYILF
Renesas
IC CLK BUFFER 1:10 250MHZ 32TQFP

Lead Time: 9-12Days

-- --
300
Total: $
HTSW-103-23-LM-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1600
Total: $
HTSW-103-23-L-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4100
Total: $
HTSW-102-17-T-D
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6600
Total: $
85311AMIT
Renesas
IC CLK BUFFER 1:2 1GHZ 8SOIC

Lead Time: 9-12Days

-- --
3200
Total: $
HTSW-102-10-T-D
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6000
Total: $
ICS854104AG
Renesas
IC CLK BUFFER 1:4 700MHZ 16TSSOP

Lead Time: 9-12Days

-- --
9500
Total: $
ICS854104AGT
Renesas
IC CLK BUFFER 1:4 700MHZ 16TSSOP

Lead Time: 9-12Days

-- --
3100
Total: $
CY2DL1510AZCT
Infineon
IC CLK BUFFER 1:10 1.5GHZ 32TQFP

Lead Time: 9-12Days

-- --
9500
Total: $
CY2DP1510AXCT
Infineon
IC CLK BUFFER 2:10 1.5GHZ 32TQFP

Lead Time: 9-12Days

-- --
9500
Total: $
CY2DL1504ZXIT
Infineon
IC CLK BUFFER 2:4 1.5GHZ 20TSSOP

Lead Time: 9-12Days

-- --
2100
Total: $
  • 1
  • 5407
  • 5408
  • 5409
  • 5410
  • 5411
  • 6854
Go to