Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SR122A2R7DAR
Kyocera Avx Components
CAP CER 2.7PF 200V NP0 RADIAL

Lead Time: 9-12Days

-- --
1500
Total: $
SR122A2R2DAR
Kyocera Avx Components
CAP CER 2.2PF 200V NP0 RADIAL

Lead Time: 9-12Days

-- --
1100
Total: $
SR122A1R5DAR
Kyocera Avx Components
CAP CER 1.5PF 200V NP0 RADIAL

Lead Time: 9-12Days

-- --
1400
Total: $
SR122A1R0DAR
Kyocera Avx Components
CAP CER 1PF 200V NP0 RADIAL

Lead Time: 9-12Days

-- --
100
Total: $
CC1206FKNPO8BN103
Yageo
CAP CER 10000PF 25V C0G/NPO 1206

MPQ: 3000

Lead Time: 9-12Days

-- --
7000
Total: $
0805J0250104JXT
Knowles
CAP CER 0.1UF 25V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
2600
Total: $
C1206C183JARACTU
Kemet(Yageo)
CAP CER 0.018UF 250V X7R 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
4100
Total: $
C430C333K1G5TA7200
Kemet(Yageo)
CAP CER 0.033UF 100V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
4300
Total: $
C430C273K1G5TA7200
Kemet(Yageo)
CAP CER 0.027UF 100V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
2800
Total: $
C430C473K5G5TA7200
Kemet(Yageo)
CAP CER 0.047UF 50V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
2800
Total: $
C430C393K5G5TA7200
Kemet(Yageo)
CAP CER 0.039UF 50V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
2700
Total: $
C430C473K3G5TA7200
Kemet(Yageo)
CAP CER 0.047UF 25V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
1600
Total: $
C430C393K3G5TA7200
Kemet(Yageo)
CAP CER 0.039UF 25V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
6100
Total: $
C420C333K1G5TA7200
Kemet(Yageo)
CAP CER 0.033UF 100V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
6800
Total: $
C420C273K1G5TA7200
Kemet(Yageo)
CAP CER 0.027UF 100V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
3200
Total: $
C420C473K5G5TA7200
Kemet(Yageo)
CAP CER 0.047UF 50V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
1600
Total: $
C420C393K5G5TA7200
Kemet(Yageo)
CAP CER 0.039UF 50V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
1200
Total: $
C420C473K3G5TA7200
Kemet(Yageo)
CAP CER 0.047UF 25V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
4500
Total: $
C420C393K3G5TA7200
Kemet(Yageo)
CAP CER 0.039UF 25V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
8500
Total: $
0603Y0250683JXT
Knowles
CAP CER 0.068UF 25V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
3300
Total: $
  • 1
  • 5351
  • 5352
  • 5353
  • 5354
  • 5355
  • 6670
Go to