Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TSM-102-03-T-SH-TR
Samtec
CONN HEADER SMD R/A 2POS 2.54MM

MPQ: 650

Lead Time: 9-12Days

-- --
5800
Total: $
EPM7512BFI256-7
Intel
IC CPLD 512MC 7.5NS 256FBGA

Lead Time: 9-12Days

-- --
5200
Total: $
800-80-003-66-001101
Preci-Dip
CONN HEADER VERT 3POS 2.54MM

Lead Time: 9-12Days

-- --
1100
Total: $
EPM7512BQC208-10
Intel
IC CPLD 512MC 10NS 208QFP

Lead Time: 9-12Days

-- --
9000
Total: $
3-174820-7
Te Connectivity
CONN HEADER SMD 7POS 1.25MM

Lead Time: 9-12Days

-- --
1300
Total: $
54102-T30-08
Amphenol
CONN HEADER VERT 16POS 2.54MM

Lead Time: 9-12Days

-- --
3400
Total: $
EPM7512BTC144-10
Intel
IC CPLD 512MC 10NS 144TQFP

Lead Time: 9-12Days

-- --
4000
Total: $
EPM7512BTC144-5
Intel
IC CPLD 512MC 5.5NS 144TQFP

Lead Time: 9-12Days

-- --
5600
Total: $
EPM7512BTC144-7
Intel
IC CPLD 512MC 7.5NS 144TQFP

Lead Time: 9-12Days

-- --
2400
Total: $
0050361768
Molex
CONN HEADER R/A 4POS 4.2MM

MPQ: 1320

Lead Time: 9-12Days

-- --
7000
Total: $
EPM7512BUC169-10
Intel
IC CPLD 512MC 10NS 169UBGA

Lead Time: 9-12Days

-- --
800
Total: $
68464-208HLF
Amphenol
HEADER BERGSTIK

Lead Time: 9-12Days

-- --
9200
Total: $
EPM7512BUC169-5
Intel
IC CPLD 512MC 5.5NS 169UBGA

Lead Time: 9-12Days

-- --
8000
Total: $
EPM7512BUC169-7
Intel
IC CPLD 512MC 7.5NS 169UBGA

Lead Time: 9-12Days

-- --
9700
Total: $
172732-3
Te Connectivity
CONN HEADER VERT 3POS 2.5MM

Lead Time: 9-12Days

-- --
3100
Total: $
EPM7512BUC169-7N
Intel
IC CPLD 512MC 7.5NS 169UBGA

Lead Time: 9-12Days

-- --
7500
Total: $
EPM9320ALC84-10
Intel
IC CPLD 320MC 10NS 84PLCC

Lead Time: 9-12Days

-- --
8500
Total: $
10136647-052111LF
Amphenol
CONN PWR4.2 VT HEADER

Lead Time: 9-12Days

-- --
4100
Total: $
EPM9320ALC84-10N
Intel
IC CPLD 320MC 10NS 84PLCC

Lead Time: 9-12Days

-- --
2800
Total: $
10136647-052112LF
Amphenol
CONN PWR4.2 VT HEADER

Lead Time: 9-12Days

-- --
4100
Total: $
  • 1
  • 5153
  • 5154
  • 5155
  • 5156
  • 5157
  • 6670
Go to