Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TSW-104-08-F-S-NA
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4500
Total: $
5T9310NLGI8
Renesas
IC CLK BUFFER 1:10 1GHZ 40VFQFPN

Lead Time: 9-12Days

-- --
5200
Total: $
TSW-103-29-F-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6900
Total: $
IDT5T9316NLGI8
Renesas
IC CLK BUFFER 2:16 1GHZ 52VFQFPN

Lead Time: 9-12Days

-- --
1000
Total: $
5T93GL02PGGI
Renesas
IC CLK BUFFER 1:2 450MHZ 20TSSOP

Lead Time: 9-12Days

-- --
9200
Total: $
5T93GL04PGGI
Renesas
IC CLK BUFFER 2:4 450MHZ 24TSSOP

Lead Time: 9-12Days

-- --
3200
Total: $
TSW-103-08-T-D-NA
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7800
Total: $
5T93GL04PGGI8
Renesas
IC CLK BUFFER 2:4 450MHZ 24TSSOP

Lead Time: 9-12Days

-- --
5400
Total: $
5T93GL061PFGI
Renesas
IC CLK BUFFER 2:6 450MHZ 32TQFP

Lead Time: 9-12Days

-- --
1100
Total: $
5T93GL061PFGI8
Renesas
IC CLK BUFFER 2:6 450MHZ 32TQFP

Lead Time: 9-12Days

-- --
400
Total: $
5T93GL06NLGI
Renesas
IC CLK BUF 2:6 800MHZ 28VFQFPN

Lead Time: 9-12Days

-- --
8100
Total: $
5T93GL06NLGI8
Renesas
IC CLK BUF 2:6 800MHZ 28VFQFPN

Lead Time: 9-12Days

-- --
7300
Total: $
TSW-102-22-S-S-NA
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2500
Total: $
5T93GL10NLGI
Renesas
IC CLK BUF 2:10 650MHZ 40VFQFPN

Lead Time: 9-12Days

-- --
7500
Total: $
TSW-102-08-L-D-NA
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7800
Total: $
TSW-102-08-H-S-RA
Samtec
CONN HEADER R/A 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5900
Total: $
TSW-102-08-F-D-NA
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6800
Total: $
TSW-102-06-H-S
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4500
Total: $
TSW-102-05-H-S
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
TSW-101-19-G-Q
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
8000
Total: $
  • 1
  • 5152
  • 5153
  • 5154
  • 5155
  • 5156
  • 6854
Go to