Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
EPM7160EQC100-10
Intel
IC CPLD 160MC 10NS 100QFP

Lead Time: 9-12Days

-- --
8400
Total: $
PBC01DAEN
Sullins Connector Solutions
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
2200
Total: $
PBC02SAEN
Sullins Connector Solutions
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8000
Total: $
EPM7160EQC100-12
Intel
IC CPLD 160MC 12NS 100QFP

Lead Time: 9-12Days

-- --
5500
Total: $
HTSW-103-21-T-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4400
Total: $
EPM7160EQC100-15
Intel
IC CPLD 160MC 15NS 100QFP

Lead Time: 9-12Days

-- --
5500
Total: $
HTSW-202-08-TM-S
Samtec
CONN HEADER VERT 2POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
8300
Total: $
EPM7160EQC100-20
Intel
IC CPLD 160MC 20NS 100QFP

Lead Time: 9-12Days

-- --
1700
Total: $
HTSW-104-08-T-S
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4700
Total: $
HTSW-103-10-TM-S-RE
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3900
Total: $
HTSW-103-10-T-S-RA
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8800
Total: $
EPM7160EQC160-15
Intel
IC CPLD 160MC 15NS 160QFP

Lead Time: 9-12Days

-- --
8400
Total: $
MTSW-103-10-T-S-530-RA
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8800
Total: $
EPM7160EQC160-20
Intel
IC CPLD 160MC 20NS 160QFP

Lead Time: 9-12Days

-- --
4400
Total: $
MTSW-103-10-T-S-510-RA
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2500
Total: $
MTSW-103-10-T-S-500-RA
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7000
Total: $
EPM7160SQC160-7
Intel
IC CPLD 160MC 7.5NS 160QFP

Lead Time: 9-12Days

-- --
6700
Total: $
MTSW-103-10-T-S-370-RA
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5000
Total: $
EPM7160STC100-6N
Intel
IC CPLD 160MC 6NS 100TQFP

Lead Time: 9-12Days

-- --
2500
Total: $
EPM7192EGC160-12
Intel
IC CPLD 192MC 12NS 160PGA

Lead Time: 9-12Days

-- --
9300
Total: $
  • 1
  • 5148
  • 5149
  • 5150
  • 5151
  • 5152
  • 6670
Go to