Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
M4A3-64/32-7VI
Lattice
IC CPLD 64MC 7.5NS 44TQFP

Lead Time: 9-12Days

-- --
5700
Total: $
0603Y0160123KDT
Knowles
CAP CER 0.012UF 16V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
4200
Total: $
DE21XSA100KA3BT02F
Murata
CAP CER

MPQ: 250

Lead Time: 9-12Days

-- --
6300
Total: $
M4A3-64/64-10VI
Lattice
IC CPLD 64MC 10NS 44TQFP

Lead Time: 9-12Days

-- --
100
Total: $
C1206C823J1RACTU
Kemet(Yageo)
CAP CER 0.082UF 100V X7R 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
4800
Total: $
M4A3-64/64-12VI
Lattice
IC CPLD 64MC 12NS 44TQFP

Lead Time: 9-12Days

-- --
4500
Total: $
M4A3-64/64-55VC
Lattice
IC CPLD 64MC 5.5NS 44TQFP

Lead Time: 9-12Days

-- --
7700
Total: $
RCER72E222K1K1H03B
Murata
CAP CER

MPQ: 500

Lead Time: 9-12Days

-- --
6000
Total: $
M4A3-64/64-7VI
Lattice
IC CPLD 64MC 7.5NS 44TQFP

Lead Time: 9-12Days

-- --
9200
Total: $
RCER72E332K1K1H03B
Murata
CAP CER

MPQ: 500

Lead Time: 9-12Days

-- --
7200
Total: $
M4A3-192/96-12FANI
Lattice
IC CPLD 192MC 12NS 144FPBGA

Lead Time: 9-12Days

-- --
100
Total: $
RCER72E153K1K1H03B
Murata
CAP CER

MPQ: 500

Lead Time: 9-12Days

-- --
6500
Total: $
RCER72E102K1K1H03B
Murata
CAP CER

MPQ: 500

Lead Time: 9-12Days

-- --
6700
Total: $
M4A3-64/32-12VNC
Lattice
IC CPLD 64MC 12NS 44TQFP

Lead Time: 9-12Days

-- --
300
Total: $
RCER72E223K1K1H03B
Murata
CAP CER

MPQ: 500

Lead Time: 9-12Days

-- --
4000
Total: $
M4A3-64/32-5VNC
Lattice
IC CPLD 64MC 5NS 44TQFP

Lead Time: 9-12Days

-- --
1800
Total: $
RCER72E472K1K1H03B
Murata
CAP CER

MPQ: 500

Lead Time: 9-12Days

-- --
1300
Total: $
M4A5-32/32-12VNC
Lattice
IC CPLD 32MC 12NS 44TQFP

Lead Time: 9-12Days

-- --
6200
Total: $
RCER72E682K1K1H03B
Murata
CAP CER

MPQ: 500

Lead Time: 9-12Days

-- --
5800
Total: $
RCER72E152K1K1H03B
Murata
CAP CER

MPQ: 500

Lead Time: 9-12Days

-- --
9100
Total: $
  • 1
  • 5118
  • 5119
  • 5120
  • 5121
  • 5122
  • 6670
Go to