Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CH585M
Wch

Lead Time: 9-12Days

-- --
5100
Total: $
GRM0335C1H3R6CA01D
Murata
MLCC 50V 3.6pF C0G

Lead Time: 9-12Days

-- --
700
Total: $
GRM0335C1H2R4CA01D
Murata
MLCC 50V 2.4pF C0G

Lead Time: 9-12Days

-- --
6300
Total: $
GRM0335C1H560JA01D
Murata
MLCC 50V ±5% 56pF C0G

Lead Time: 9-12Days

-- --
1100
Total: $
GRM0335C1H2R5CA01D
Murata
Capacitor: ceramic; MLCC; 2.5pF; 50V; C0G (NP0); ±0.25pF; SMD;

Lead Time: 9-12Days

-- --
6300
Total: $
GCM1555C1H6R0CA16D
Murata
CAP

Lead Time: 9-12Days

-- --
100
Total: $
GJM1555C1H2R7BB01D
Murata
MLCC 50V 2.7pF C0G

Lead Time: 9-12Days

-- --
5700
Total: $
NCP03WB473F05RL
Murata
THERMISTOR NTC 47KOHM 4050K

Lead Time: 9-12Days

-- --
700
Total: $
UAT36A03L05
Yageo
ESD UAT36A03L05 SOT-363

Lead Time: 9-12Days

-- --
100
Total: $
511KD10
Yageo
10mm 510V

Lead Time: 9-12Days

-- --
5700
Total: $
A3144EUA-T-JSM
Jsmicro Semiconductor

Lead Time: 9-12Days

-- --
3700
Total: $
3RL090M-6-SSS
Yageo

Lead Time: 9-12Days

-- --
3300
Total: $
5.0SMDJ18CA/TR13
Yageo

Lead Time: 9-12Days

-- --
8700
Total: $
5.0SMDJ70A/TR13
Yageo

Lead Time: 9-12Days

-- --
2900
Total: $
2RM1000L-8/B
Yageo
2RM1000L-8/B

Lead Time: 9-12Days

-- --
3500
Total: $
GRM1885C1H182JA01D
Murata
MLCC 50V ±5% 1.8nF C0G

Lead Time: 9-12Days

-- --
1500
Total: $
GRM155R61A564KE15D
Murata
GRM155R61A564KE15D

Lead Time: 9-12Days

-- --
5700
Total: $
GRM1555C1HR40BA01D
Murata
0402 NPO 0.4pF 50V ±0.1pF

Lead Time: 9-12Days

-- --
8900
Total: $
GRM155R71E224KE14D
Murata
MLCC -

Lead Time: 9-12Days

-- --
9900
Total: $
GRM21BC80G476ME15L
Murata
Capacitor: ceramic; MLCC; 47uF; 4V; X6S; ±20%; SMD;

Lead Time: 9-12Days

-- --
3500
Total: $
  • 1
  • 508
  • 509
  • 510
  • 511
  • 512
  • 6854
Go to