Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
DFE201612P-1R0M=P2
Murata
54mΩ 1uH ±20% 2.7A

Lead Time: 9-12Days

-- --
1700
Total: $
LQW15AN13NG00D
Murata
210mΩ 13nH ±2% 430mA

Lead Time: 9-12Days

-- --
6500
Total: $
LQP03TN33NJ02D
Murata
2.95Ω 33nH ±5% 120mA

Lead Time: 9-12Days

-- --
9500
Total: $
LQG15HS33NG02D
Murata
580mΩ 33nH ±2% 350mA

Lead Time: 9-12Days

-- --
8500
Total: $
LQP03TG5N1H02D
Murata
5.1nH----250mA-720--02010603-

Lead Time: 9-12Days

-- --
1700
Total: $
LQP03TG12NH02D
Murata
1.78Ω 12nH ±3% 180mA

Lead Time: 9-12Days

-- --
7100
Total: $
SN74LVC1G14QDRYRQ1
Texas Instruments
-IC-1---6-USON1.45x1

Lead Time: 9-12Days

-- --
2300
Total: $
271KD20
Yageo
- 1W ±10%

Lead Time: 9-12Days

-- --
3900
Total: $
CAHCT1G125QDBVRQ1
Texas Instruments
Automotive single 3V to 5.5V buffer with 3-state outputs and TTL compatible

Lead Time: 9-12Days

-- --
1300
Total: $
CH585M
Wch

Lead Time: 9-12Days

-- --
5100
Total: $
GRM0335C1H3R6CA01D
Murata
MLCC 50V 3.6pF C0G

Lead Time: 9-12Days

-- --
700
Total: $
GRM0335C1H2R4CA01D
Murata
MLCC 50V 2.4pF C0G

Lead Time: 9-12Days

-- --
6300
Total: $
GRM0335C1H560JA01D
Murata
MLCC 50V ±5% 56pF C0G

Lead Time: 9-12Days

-- --
1100
Total: $
GRM0335C1H2R5CA01D
Murata
Capacitor: ceramic; MLCC; 2.5pF; 50V; C0G (NP0); ±0.25pF; SMD;

Lead Time: 9-12Days

-- --
6300
Total: $
GCM1555C1H6R0CA16D
Murata
CAP

Lead Time: 9-12Days

-- --
100
Total: $
GJM1555C1H2R7BB01D
Murata
MLCC 50V 2.7pF C0G

Lead Time: 9-12Days

-- --
5700
Total: $
NCP03WB473F05RL
Murata
THERMISTOR NTC 47KOHM 4050K

Lead Time: 9-12Days

-- --
700
Total: $
UAT36A03L05
Yageo
ESD UAT36A03L05 SOT-363

Lead Time: 9-12Days

-- --
100
Total: $
511KD10
Yageo
10mm 510V

Lead Time: 9-12Days

-- --
5700
Total: $
A3144EUA-T-JSM
Jsmicro Semiconductor

Lead Time: 9-12Days

-- --
3700
Total: $
  • 1
  • 507
  • 508
  • 509
  • 510
  • 511
  • 6854
Go to