Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BFC238312473
Vishay
CAP FILM 0.047UF 5% 400VDC RAD

MPQ: 1100

Lead Time: 9-12Days

-- --
4200
Total: $
M4A3-128/64-10YI
Lattice
IC CPLD 128MC 10NS 100QFP

Lead Time: 9-12Days

-- --
9700
Total: $
BFC238302823
Vishay
CAP FILM 0.082UF 5% 250VDC RAD

MPQ: 1100

Lead Time: 9-12Days

-- --
7200
Total: $
M4A3-128/64-12CAI
Lattice
IC CPLD 128MC 12NS 100CABGA

Lead Time: 9-12Days

-- --
9400
Total: $
M4A3-128/64-12YI
Lattice
IC CPLD 128MC 12NS 100QFP

Lead Time: 9-12Days

-- --
4600
Total: $
BFC238353472
Vishay
CAP FILM 4700PF 5% 1.6KVDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
1800
Total: $
M4A3-128/64-55CAC
Lattice
IC CPLD 128MC 5.5NS 100CABGA

Lead Time: 9-12Days

-- --
2200
Total: $
M4A3-128/64-55YC
Lattice
IC CPLD 128MC 5.5NS 100QFP

Lead Time: 9-12Days

-- --
7600
Total: $
BFC238313683
Vishay
CAP FILM 0.068UF 5% 400VDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
500
Total: $
M4A3-128/64-7CAC
Lattice
IC CPLD 128MC 7.5NS 100CABGA

Lead Time: 9-12Days

-- --
4000
Total: $
M4A3-128/64-7CAI
Lattice
IC CPLD 128MC 7.5NS 100CABGA

Lead Time: 9-12Days

-- --
6900
Total: $
BFC238342472
Vishay
CAP FILM 4700PF 5% 1.4KVDC RAD

MPQ: 900

Lead Time: 9-12Days

-- --
8000
Total: $
M4A3-128/64-7YC
Lattice
IC CPLD 128MC 7.5NS 100QFP

Lead Time: 9-12Days

-- --
5100
Total: $
M4A3-128/64-7YI
Lattice
IC CPLD 128MC 7.5NS 100QFP

Lead Time: 9-12Days

-- --
2500
Total: $
M4A3-192/96-10FAC
Lattice
IC CPLD 192MC 10NS 144FPBGA

Lead Time: 9-12Days

-- --
3000
Total: $
MKP385513016JII2B0
Vishay
CAP FILM 1.3UF 5% 160VDC RADIAL

MPQ: 250

Lead Time: 9-12Days

-- --
9200
Total: $
MKP385512016JII2B0
Vishay
CAP FILM 1.2UF 5% 160VDC RADIAL

MPQ: 250

Lead Time: 9-12Days

-- --
9000
Total: $
MKP385511016JII2B0
Vishay
CAP FILM 1.1UF 5% 160VDC RADIAL

MPQ: 250

Lead Time: 9-12Days

-- --
3200
Total: $
MKP385368160JI02W0
Vishay
CAP FILM 0.068UF 5% 1.6KVDC RAD

MPQ: 350

Lead Time: 9-12Days

-- --
7900
Total: $
M4A3-192/96-7FAI
Lattice
IC CPLD 192MC 7.5NS 144FPBGA

Lead Time: 9-12Days

-- --
7200
Total: $
  • 1
  • 5080
  • 5081
  • 5082
  • 5083
  • 5084
  • 6670
Go to