Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
1.5SMC39CA/TR13
Yageo

Lead Time: 9-12Days

-- --
1900
Total: $
GJM1555C1H1R0WB01D
Murata
MLCC 50V 1pF C0G

Lead Time: 9-12Days

-- --
7700
Total: $
GJM1555C1H2R7BB01D
Murata
MLCC 50V 2.7pF C0G

Lead Time: 9-12Days

-- --
5700
Total: $
GCM1555C1H6R0CA16D
Murata
CAP

Lead Time: 9-12Days

-- --
100
Total: $
NCP03WB473F05RL
Murata
THERMISTOR NTC 47KOHM 4050K

Lead Time: 9-12Days

-- --
700
Total: $
5.0SMDJ18CA/TR13
Yageo

Lead Time: 9-12Days

-- --
8700
Total: $
511KD10
Yageo
10mm 510V

Lead Time: 9-12Days

-- --
5700
Total: $
5.0SMDJ70A/TR13
Yageo

Lead Time: 9-12Days

-- --
2900
Total: $
3RL090M-6-SSS
Yageo

Lead Time: 9-12Days

-- --
3300
Total: $
CH585M
Wch

Lead Time: 9-12Days

-- --
5100
Total: $
LQP03TG12NH02D
Murata
1.78Ω 12nH ±3% 180mA

Lead Time: 9-12Days

-- --
7100
Total: $
LQG15HS33NG02D
Murata
580mΩ 33nH ±2% 350mA

Lead Time: 9-12Days

-- --
8500
Total: $
LQW15AN13NG00D
Murata
210mΩ 13nH ±2% 430mA

Lead Time: 9-12Days

-- --
6500
Total: $
LQP03TN33NJ02D
Murata
2.95Ω 33nH ±5% 120mA

Lead Time: 9-12Days

-- --
9500
Total: $
LQP03TG5N1H02D
Murata
5.1nH----250mA-720--02010603-

Lead Time: 9-12Days

-- --
1700
Total: $
SMAJ60CA/TR13
Yageo
TVS SMAJ60CA/TR13 96.8V SMADO-214AC

Lead Time: 9-12Days

-- --
6300
Total: $
SMAJ26CA/TR13
Yageo

Lead Time: 9-12Days

-- --
9700
Total: $
2RM1000L-8/B
Yageo
2RM1000L-8/B

Lead Time: 9-12Days

-- --
3500
Total: $
ERJ3EKF76R8V
Panasonic
100mW 76.8Ω ±1%

Lead Time: 9-12Days

-- --
6700
Total: $
ERJ2RKF2263X
Panasonic
0402

Lead Time: 9-12Days

-- --
6900
Total: $
  • 1
  • 503
  • 504
  • 505
  • 506
  • 507
  • 6755
Go to