Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
AT817C-FEH-DE
Aote
- AT817C-FeH-DE DIP-4

Lead Time: 9-12Days

-- --
2700
Total: $
AW21036QNR
Awinic
LED

Lead Time: 9-12Days

-- --
300
Total: $
LTV-217B
Aote

Lead Time: 9-12Days

-- --
5700
Total: $
LTV-214B
Aote

Lead Time: 9-12Days

-- --
6100
Total: $
PC817DS
Aote

Lead Time: 9-12Days

-- --
8100
Total: $
OR-314(B)W-TA1
Orient

Lead Time: 9-12Days

-- --
7100
Total: $
WE05DRF-B
Cygwayon
Single Channel

Lead Time: 9-12Days

-- --
4500
Total: $
WFR1N4148WT
Cygwayon
SOD-523

Lead Time: 9-12Days

-- --
4900
Total: $
WS05DLC-B
Cygwayon

Lead Time: 9-12Days

-- --
2300
Total: $
1-2199230-6
Te Connectivity
CONN EDGE DUAL FMALE 67POS

Lead Time: 9-12Days

-- --
6700
Total: $
CSD17501Q5A
Texas Instruments
MOSFET CSD17501Q5A

Lead Time: 9-12Days

-- --
4300
Total: $
MOC3041M
Aote
MOC3041M DIP-6

Lead Time: 9-12Days

-- --
3700
Total: $
USB2513BI-AEZG
Microchip
USB--USB-2.0-USB--36-QFN6x6

Lead Time: 9-12Days

-- --
3300
Total: $
5352332-1
Te Connectivity
Hard Metric Backplane Connectors, PCB Mount Header, ≤1 Gb/s, 22 Column, 7 Row, Mezzanine, 154 Position, 2 mm [.078 in] Centerline, Z-PACK 2mm

Lead Time: 9-12Days

-- --
100
Total: $
PS2701-1-L
Aote
- PS2701-1-L SOP-4

Lead Time: 9-12Days

-- --
9300
Total: $
PJA3441-AU_R1_000A1
Panjit
MOSFET 1.25W 40V 3.1A 1P

Lead Time: 9-12Days

-- --
9700
Total: $
TLP181GB-S
Aote
- TLP181GB-S SOP-4

Lead Time: 9-12Days

-- --
7700
Total: $
BSP752R
Infineon
BSP752R

Lead Time: 9-12Days

-- --
6300
Total: $
EL817DS
Aote

Lead Time: 9-12Days

-- --
8300
Total: $
ELM3052
Aote

Lead Time: 9-12Days

-- --
8700
Total: $
  • 1
  • 489
  • 490
  • 491
  • 492
  • 493
  • 6755
Go to