
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
1040460417
| Molex |
CONN HEADER SMD R/A 4POS 2MM
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
ATF1504ASV-15AU44
| Microchip |
IC CPLD 64MC 15NS 44TQFP
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
0027602062
| Molex |
CONN HEADER VERT 6POS 3.96MM
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
XC2C128-6VQG100C
| Amd |
IC CPLD 128MC 5.7NS 100VQFP
| Lead Time: 9-12Days | -- -- | 8400 | Total:
$
| |
0559350930
| Molex |
CONN HEADER R/A 9POS 2MM
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
XCR3256XL-12PQG208C
| Amd |
IC CPLD 256MC 10.8NS 208QFP
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
9-2232043-3
| Te Connectivity |
CONN HEADER VERT 3POS 5MM
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
LC4256V-10TN100I
| Lattice |
IC CPLD 256MC 10NS 100TQFP
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
XCR3256XL-10TQG144I
| Amd |
IC CPLD 256MC 9.1NS 144TQFP
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
2232044-2
| Te Connectivity |
CONN HEADER VERT 2POS 5MM
| MPQ: 3200 Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
LC4512V-75TN176C
| Lattice |
IC CPLD 512MC 7.5NS 176TQFP
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
104346-3
| Te Connectivity |
CONN HEADER VERT 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
M4A3-32/32-10VNC
| Lattice |
IC CPLD 32MC 10NS 44TQFP
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
10114831-11111LF
| Amphenol |
CONN HEADER R/A 11POS 1.25MM
| Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
M4A5-32/32-10VNC
| Lattice |
IC CPLD 32MC 10NS 44TQFP
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
LC4064V-25TN48C
| Lattice |
IC CPLD 64MC 2.5NS 48TQFP
| Lead Time: 9-12Days | -- -- | 400 | Total:
$
| |
M20-8760646
| Harwin |
CONN HEADER SMD 12POS 2.54MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 200 | Total:
$
| |
DF33-3P-3.3DSA(24)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 3POS 3.3MM
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
EPM7064AETC100-10N
| Intel |
IC CPLD 64MC 10NS 100TQFP
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
77312-477LF
| Amphenol |
CONN HEADER VERT 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
|