Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
LC4064V-5TN48C
Lattice
IC CPLD 64MC 5NS 48TQFP

Lead Time: 9-12Days

-- --
7900
Total: $
MKP383468025JII2B0
Vishay
CAP FILM 0.68UF 5% 250VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
2800
Total: $
BFC236847125
Vishay
CAP FILM 1.2UF 5% 250VDC RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
8300
Total: $
ATF2500C-20PU
Microchip
IC CPLD 24MC 20NS 40DIP

Lead Time: 9-12Days

-- --
3300
Total: $
929710-01-01
3M
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
5600
Total: $
XC9536XL-7VQG44C
Amd
IC CPLD 36MC 7.5NS 44VQFP

Lead Time: 9-12Days

-- --
8800
Total: $
BFC236846125
Vishay
CAP FILM 1.2UF 5% 250VDC RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
4400
Total: $
EPM7064AETC44-10N
Intel
IC CPLD 64MC 10NS 44TQFP

Lead Time: 9-12Days

-- --
9100
Total: $
PRPC007SBCN-M71RC
Sullins Connector Solutions
CONN HEADER R/A 7POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
PBC02SFCN
Sullins Connector Solutions
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
500
Total: $
BFC236842125
Vishay
CAP FILM 1.2UF 5% 250VDC RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
3100
Total: $
HTSW-103-20-T-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1000
Total: $
BFC233822334
Vishay
CAP FILM 0.33UF 20% 630VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
3800
Total: $
HTMS-102-02-L-S-RA
Samtec
CONN HDR .050" 10POS

MPQ: 1

Lead Time: 9-12Days

-- --
7500
Total: $
LC4064V-5TN48I
Lattice
IC CPLD 64MC 5NS 48TQFP

Lead Time: 9-12Days

-- --
1200
Total: $
BFC236859154
Vishay
CAP FILM 0.15UF 5% 400VDC RADIAL

MPQ: 800

Lead Time: 9-12Days

-- --
3900
Total: $
BFC233663223
Vishay
CAP FILM 0.022UF 20% 1KVDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
8600
Total: $
TMS-102-02-L-S-RA
Samtec
CONN HEADER R/A 2POS 1.27MM

MPQ: 1

Lead Time: 9-12Days

-- --
4300
Total: $
XC9536XL-7VQG44I
Amd
IC CPLD 36MC 7.5NS 44VQFP

Lead Time: 9-12Days

-- --
2200
Total: $
BFC247029394
Vishay
CAP FILM 0.39UF 5% 100VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
4600
Total: $
  • 1
  • 4891
  • 4892
  • 4893
  • 4894
  • 4895
  • 6670
Go to