Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BFC2373GF684MI
Vishay
CAP FILM 0.68UF 5% 630VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
9300
Total: $
SI5338N-B05577-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
4700
Total: $
SI5338N-B05578-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
7800
Total: $
SI5338N-B05635-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
7400
Total: $
SI5338N-B05684-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
800
Total: $
BFC246854225
Vishay
CAP FILM 2.2UF 5% 250VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
6500
Total: $
MKP383436100JKP2T0
Vishay
CAP FILM 0.36UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
100
Total: $
SI5338N-B05753-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
200
Total: $
MKP383436100JKM2T0
Vishay
CAP FILM 0.36UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
7900
Total: $
MKP383436100JKI2B0
Vishay
CAP FILM 0.36UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
5400
Total: $
SI5338N-B05866-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
7900
Total: $
F17724332263
Vishay
CAP FILM 0.33UF 20% 630VDC RAD

MPQ: 400

Lead Time: 9-12Days

-- --
3600
Total: $
SI5338N-B05878-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
5900
Total: $
160104J1000N-F
Cornell Dubilier
CAP FILM 0.1UF 5% 1KVDC RADIAL

Lead Time: 9-12Days

-- --
7000
Total: $
SI5338N-B05879-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
7600
Total: $
BFC247990187
Vishay
CAP FILM 0.43UF 5% 400VDC RADIAL

MPQ: 650

Lead Time: 9-12Days

-- --
1900
Total: $
SI5338N-B05936-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
6100
Total: $
BFC247944624
Vishay
CAP FILM 0.62UF 5% 250VDC RADIAL

MPQ: 600

Lead Time: 9-12Days

-- --
9400
Total: $
BFC247942624
Vishay
CAP FILM 0.62UF 5% 250VDC RADIAL

MPQ: 600

Lead Time: 9-12Days

-- --
2500
Total: $
B32926C3825K000
Tdk
CAP FILM 8.2UF 10% 630VDC RADIAL

MPQ: 640

Lead Time: 9-12Days

-- --
9000
Total: $
  • 1
  • 4862
  • 4863
  • 4864
  • 4865
  • 4866
  • 6854
Go to