Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
X9420YV14I-2.7T1
Renesas
IC DGT POT 2.5KOHM 64TAP 14TSSOP

Lead Time: 9-12Days

-- --
2400
Total: $
C430C393J5G5TA7200
Kemet(Yageo)
CAP CER 0.039UF 50V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
3300
Total: $
X9420YV14IT1
Renesas
IC DGT POT 2.5KOHM 64TAP 14TSSOP

Lead Time: 9-12Days

-- --
3100
Total: $
C430C473J3G5TA7200
Kemet(Yageo)
CAP CER 0.047UF 25V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
9500
Total: $
X9420YV14T1
Renesas
IC DGT POT 2.5KOHM 64TAP 14TSSOP

Lead Time: 9-12Days

-- --
7700
Total: $
C430C393J3G5TA7200
Kemet(Yageo)
CAP CER 0.039UF 25V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
1300
Total: $
C420C333J1G5TA7200
Kemet(Yageo)
CAP CER 0.033UF 100V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
1200
Total: $
C420C273J1G5TA7200
Kemet(Yageo)
CAP CER 0.027UF 100V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
4400
Total: $
C420C473J5G5TA7200
Kemet(Yageo)
CAP CER 0.047UF 50V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
5600
Total: $
C420C393J5G5TA7200
Kemet(Yageo)
CAP CER 0.039UF 50V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
2600
Total: $
C420C473J3G5TA7200
Kemet(Yageo)
CAP CER 0.047UF 25V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
4000
Total: $
C420C393J3G5TA7200
Kemet(Yageo)
CAP CER 0.039UF 25V C0G AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
4900
Total: $
VJ0603D9R1CXPAP
Vishay
CAP CER 9.1PF 250V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
2000
Total: $
VJ0603D9R1CXPAJ
Vishay
CAP CER 9.1PF 250V C0G/NP0 0603

Lead Time: 9-12Days

-- --
5100
Total: $
VJ0603D9R1CXPAC
Vishay
CAP CER 9.1PF 250V C0G/NP0 0603

Lead Time: 9-12Days

-- --
5700
Total: $
VJ0603D9R1CLPAC
Vishay
CAP CER 9.1PF 250V C0G/NP0 0603

Lead Time: 9-12Days

-- --
8900
Total: $
VJ0603D8R2CXPAP
Vishay
CAP CER 8.2PF 250V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
2900
Total: $
VJ0603D8R2CXPAC
Vishay
CAP CER 8.2PF 250V C0G/NP0 0603

Lead Time: 9-12Days

-- --
8200
Total: $
X9421WV14I-2.7T1
Renesas
IC DGTL POT 10KOHM 64TAP 14TSSOP

Lead Time: 9-12Days

-- --
4600
Total: $
VJ0603D7R5CXPAP
Vishay
CAP CER 7.5PF 250V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
4000
Total: $
  • 1
  • 4847
  • 4848
  • 4849
  • 4850
  • 4851
  • 6670
Go to