Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
X93156WM8IZ-2.7
Renesas
IC DGTL POT 12.5KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
6300
Total: $
X9315TM
Renesas
IC DGTL POT 100KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
7900
Total: $
VJ0603D181JXXAT
Vishay
CAP CER 180PF 25V C0G/NP0 0603

Lead Time: 9-12Days

-- --
8900
Total: $
X9315TM-2.7T1
Renesas
IC DGTL POT 100KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
1200
Total: $
X9315TMI-2.7
Renesas
IC DGTL POT 100KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
9600
Total: $
X9315TMI-2.7T1
Renesas
IC DGTL POT 100KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
9600
Total: $
X9315TMI-2.7T2
Renesas
IC DGTL POT 100KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
7100
Total: $
VJ0603D181JXXAR
Vishay
CAP CER 180PF 25V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
0
Total: $
VJ0603D181JXXAJ
Vishay
CAP CER 180PF 25V C0G/NP0 0603

Lead Time: 9-12Days

-- --
7900
Total: $
X9315TMIT1
Renesas
IC DGTL POT 100KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
2600
Total: $
VJ0603D181JXAAT
Vishay
CAP CER 180PF 50V C0G/NP0 0603

Lead Time: 9-12Days

-- --
9300
Total: $
X9315TMT1
Renesas
IC DGTL POT 100KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
5100
Total: $
VJ0603D181JXAAR
Vishay
CAP CER 180PF 50V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
6300
Total: $
VJ0603D181JXAAJ
Vishay
CAP CER 180PF 50V C0G/NP0 0603

Lead Time: 9-12Days

-- --
9700
Total: $
X9315TS-2.7T1
Renesas
IC DGTL POT 100KOHM 32TAP 8SOIC

Lead Time: 9-12Days

-- --
0
Total: $
VJ0603D151JXXAT
Vishay
CAP CER 150PF 25V C0G/NP0 0603

Lead Time: 9-12Days

-- --
8800
Total: $
VJ0603D151JXXAR
Vishay
CAP CER 150PF 25V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
2800
Total: $
X9315UM-2.7T1
Renesas
IC DGTL POT 50KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
5800
Total: $
VJ0603D151JXXAJ
Vishay
CAP CER 150PF 25V C0G/NP0 0603

Lead Time: 9-12Days

-- --
4300
Total: $
VJ0603D151JXAAT
Vishay
CAP CER 150PF 50V C0G/NP0 0603

Lead Time: 9-12Days

-- --
6200
Total: $
  • 1
  • 4836
  • 4837
  • 4838
  • 4839
  • 4840
  • 6670
Go to