Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TSW-102-21-F-D
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8900
Total: $
SI5338L-B05700-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
5400
Total: $
SI5338L-B05814-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
6200
Total: $
SI5338L-B05947-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
6100
Total: $
TSW-102-14-H-S
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4000
Total: $
SI5338L-B06099-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
3300
Total: $
SI5338L-B06100-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
6500
Total: $
TSW-102-12-T-Q-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6300
Total: $
TSW-102-07-L-Q
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6900
Total: $
TSW-102-07-F-Q
Samtec
CONN HEADER VERT 4POS 2.54MM

Lead Time: 9-12Days

-- --
6900
Total: $
TSW-101-26-L-T
Samtec
CONN HEADER VERT 3POS

MPQ: 1

Lead Time: 9-12Days

-- --
2800
Total: $
TSW-101-14-G-T
Samtec
CONN HEADER VERT 3POS

Lead Time: 9-12Days

-- --
300
Total: $
TSW-101-08-H-D
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
1400
Total: $
TSW-101-08-F-D-LA
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
6200
Total: $
TSW-101-05-F-D-LL
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
6300
Total: $
TMM-104-05-T-S-SM
Samtec
2MM TERMINAL STRIP

MPQ: 73

Lead Time: 9-12Days

-- --
2200
Total: $
TMM-104-04-T-S-SM
Samtec
2MM TERMINAL STRIP

MPQ: 73

Lead Time: 9-12Days

-- --
3200
Total: $
TMM-103-05-F-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
6700
Total: $
TMM-103-04-F-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
9100
Total: $
TMM-103-03-F-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
400
Total: $
  • 1
  • 4831
  • 4832
  • 4833
  • 4834
  • 4835
  • 6854
Go to