Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
9DBU0641AKILF
Renesas
IC BUFFER 6OUTPUT 1.5V 40MLF

MPQ: 490

Lead Time: 9-12Days

-- --
9800
Total: $
PI6CFGL601BZHIE
Diodes Incorporated
IC CLOCK 100MHZ 1CIR 32TQFN

Lead Time: 9-12Days

-- --
9300
Total: $
9DB633AGLF
Renesas
IC CLK FANOUT/BUFF ZD 28TSSOP

MPQ: 50

Lead Time: 9-12Days

-- --
7200
Total: $
932S421BGLF
Renesas
IC PCIE GEN2 MAIN CLOCK 56TSSOP

Lead Time: 9-12Days

-- --
6000
Total: $
9ZX21201BKLF
Renesas
IC Z-BUFFER 12OUT DIFF 64MLF

Lead Time: 9-12Days

-- --
6800
Total: $
9VRS4339BKLF
Renesas
IC CLOCK TIMING 200MHZ 56MLF

MPQ: 260

Lead Time: 9-12Days

-- --
1900
Total: $
9VRS4338DKLF
Renesas
IC CLOCK TIMING 200MHZ

Lead Time: 9-12Days

-- --
9600
Total: $
B32526R0226K000
Tdk
CAP FILM 22UF 10% 63VDC RADIAL

MPQ: 1620

Lead Time: 9-12Days

-- --
3300
Total: $
932SQ420DGLF
Renesas
IC CLOCK SYNTHESIZER 64TSSOP

MPQ: 28

Lead Time: 9-12Days

-- --
3400
Total: $
BFC238302824
Vishay
CAP FILM 0.82UF 5% 250VDC RADIAL

MPQ: 700

Lead Time: 9-12Days

-- --
6600
Total: $
MKT-A 5,6 UF/250V.
Visaton
CAP FILM 5.6UF 5% 250VDC AXIAL

MPQ: 10

Lead Time: 9-12Days

-- --
5300
Total: $
841S102EGILF
Renesas
IC CLK GENERATOR PLL 20-TSSOP

MPQ: 74

Lead Time: 9-12Days

-- --
7600
Total: $
82V3012PVG
Renesas
IC PLL WAN T1/E1/OC3 DUAL 56SSOP

Lead Time: 9-12Days

-- --
9100
Total: $
MKP385462100JKP2T0
Vishay
CAP FILM 0.62UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
5800
Total: $
9DBL0841BKILFT
Renesas
IC CLK FANOUT/BUFF ZD 48VFQFPN

MPQ: 2500

Lead Time: 9-12Days

-- --
9900
Total: $
MKP385462100JKM2T0
Vishay
CAP FILM 0.62UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
7400
Total: $
MKP385462100JKI2B0
Vishay
CAP FILM 0.62UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
8400
Total: $
BFC237325275
Vishay
CAP FILM 2.7UF 10% 100VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
600
Total: $
730P106X9250
Cornell Dubilier
CAP FILM 10UF 10% 250VDC AXIAL

Lead Time: 9-12Days

-- --
8100
Total: $
BFC247942824
Vishay
CAP FILM 0.82UF 5% 250VDC RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
4000
Total: $
  • 1
  • 4776
  • 4777
  • 4778
  • 4779
  • 4780
  • 6854
Go to