Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FTC201612S1R5MBCA
Cjiang
4A 1.5uH ±20% 4A SMD,1.6x2mm

Lead Time: 9-12Days

-- --
2100
Total: $
PSPMAA0503-1R0M-ANP
Prod
11A 1uH ±20% 7A SMD,5.4x5.2mm

Lead Time: 9-12Days

-- --
3900
Total: $
PSPMAA1265H-6R8M-ANF
Prod
6.8uH ±20% SMD-2P,12.8x13.2mm

Lead Time: 9-12Days

-- --
5700
Total: $
PSTMAA252012-220MB
Prod

Lead Time: 9-12Days

-- --
9100
Total: $
SK36_R1_00001
Panjit
750mV@3A 60V 100uA@60V 3A SMCDO-214AB

Lead Time: 9-12Days

-- --
5100
Total: $
MMBT5551_R1_00101
Panjit
MMBT5551_R1_00101 SOT-23

Lead Time: 9-12Days

-- --
500
Total: $
SCJA1117B-1.8-A
Jscj
LDO 20V 1A 60dB 1.8V

Lead Time: 9-12Days

-- --
8500
Total: $
SRM54ALF_R1_00001
Panjit

Lead Time: 9-12Days

-- --
3300
Total: $
DRV8870DDAR
Jsmicro Semiconductor

Lead Time: 9-12Days

-- --
1300
Total: $
FTC252012SR68MBCA
Cjiang
6.5A 680nH ±20% 6.3A SMD,2x2.5mm

Lead Time: 9-12Days

-- --
1900
Total: $
BAS321
Jsmicro Semiconductor
SOD-323

Lead Time: 9-12Days

-- --
1500
Total: $
FACT3225-101-2P-T
Cjiang
100uH@100kHz 50V 150mA SMD-4P,3.2x2.5mm

Lead Time: 9-12Days

-- --
3700
Total: $
FDCW3216-2-601TF
Cjiang
600Ω@100MHz 50V 260mA 1206

Lead Time: 9-12Days

-- --
900
Total: $
FDCW2012-2-601TF
Cjiang
600Ω@100MHz 50V 300mA 0805

Lead Time: 9-12Days

-- --
2900
Total: $
FTC252012S1R0MBCD
Cjiang
6.5A 1uH ±20% 5.2A 1008

Lead Time: 9-12Days

-- --
4700
Total: $
LQG18HN27NJ00D
Murata
540mΩ 27nH ±5% 500mA

Lead Time: 9-12Days

-- --
8700
Total: $
PCAQ3225A-142S
Prod
50V 50V 1.5A SMD,3.2x2.5x1.9mm

Lead Time: 9-12Days

-- --
3100
Total: $
PCAQ9070MW-302
Prod
125V 125V 2A

Lead Time: 9-12Days

-- --
5300
Total: $
PDSH0512I-102K
Prod
/ 210mA 1mH ±10% 210mA ,D5xL12.5mm

Lead Time: 9-12Days

-- --
4500
Total: $
RL1812A121K
Ruilon
!

Lead Time: 9-12Days

-- --
9300
Total: $
  • 1
  • 460
  • 461
  • 462
  • 463
  • 464
  • 6755
Go to