Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MWSA0402S-R33MT
Sunlord
12A 330nH ±20% 10A SMD,4.4x4.2mm

Lead Time: 9-12Days

-- --
8900
Total: $
MWSA0402S-R47MT
Sunlord
9.5A 470nH ±20% 7.5A

Lead Time: 9-12Days

-- --
9300
Total: $
MWSA0503S-R68MT
Sunlord
11.5A 680nH ±20% 9A

Lead Time: 9-12Days

-- --
1500
Total: $
MWSA0503S-R47MT
Sunlord
15A 470nH ±20% 11A SMD,5.4x5.2mm

Lead Time: 9-12Days

-- --
1700
Total: $
MWSA1004S-1R5MT
Sunlord
24A 1.5uH ±20% 16A SMD,11x10mm

Lead Time: 9-12Days

-- --
4700
Total: $
PZ1005U601-R50TF
Sunlord
600Ω@100MHz ±25% 500mA 0402

Lead Time: 9-12Days

-- --
6700
Total: $
PZ1005E121-R70TF
Sunlord
120Ω@100MHz 130mΩ ±25% 700mA 0402

Lead Time: 9-12Days

-- --
7100
Total: $
GZ2012U221TF
Sunlord
220Ω@100MHz 200mΩ ±25% 600mA 0805

Lead Time: 9-12Days

-- --
2100
Total: $
HPZ1005U221-R70TF
Sunlord
220Ω@100MHz 250mΩ ±25% 250mA 0402

Lead Time: 9-12Days

-- --
6100
Total: $
HPZ1608D121-1R5TF
Sunlord
120Ω@100MHz 70mΩ ±25% 1.5A 0603

Lead Time: 9-12Days

-- --
300
Total: $
MWSA0618S-100MT
Sunlord
4A 10uH ±20% 2.3A SMD,7x6.6mm

Lead Time: 9-12Days

-- --
1300
Total: $
MWSA1004S-1R0MT
Sunlord
28A 1uH ±20% 19A SMD,11x10mm

Lead Time: 9-12Days

-- --
4500
Total: $
RS07J-GS18
Vishay
--600V-500mA--DO-219ABSMF

Lead Time: 9-12Days

-- --
9700
Total: $
SDCL1005C7N5JTDF
Sunlord
400mΩ 7.5nH ±5% 300mA 0402

Lead Time: 9-12Days

-- --
6500
Total: $
SDCL1005C8N2JTDFM01
Sunlord
400mΩ 8.2nH ±5% 300mA 0402

Lead Time: 9-12Days

-- --
7500
Total: $
SPH201610H100MT
Sunlord
550mA 10uH ±20% 450mA 0806

Lead Time: 9-12Days

-- --
1100
Total: $
SPH201610H2R2MT
Sunlord
1.45A 2.2uH ±20% 1.1A 0806

Lead Time: 9-12Days

-- --
1900
Total: $
SWPA252012S150MT
Sunlord
680mA 15uH ±20% 420mA 1008

Lead Time: 9-12Days

-- --
9100
Total: $
SWPA252012S1R5MT
Sunlord
2.24A 1.5uH ±20% 1.4A 1008

Lead Time: 9-12Days

-- --
900
Total: $
π160U30
2Pai Semi

Lead Time: 9-12Days

-- --
2900
Total: $
  • 1
  • 456
  • 457
  • 458
  • 459
  • 460
  • 6854
Go to