Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IRG7CH35UED
Infineon
IGBT 1200V ULTRA FAST DIE

Lead Time: 9-12Days

-- --
3200
Total: $
MKP383411250JPP2T0
Vishay
CAP FILM 0.11UF 5% 2.5KVDC RAD

MPQ: 105

Lead Time: 9-12Days

-- --
8200
Total: $
MKP383411250JPM2T0
Vishay
CAP FILM 0.11UF 5% 2.5KVDC RAD

MPQ: 105

Lead Time: 9-12Days

-- --
5300
Total: $
MKP383411250JPI2T0
Vishay
CAP FILM 0.11UF 5% 2.5KVDC RAD

MPQ: 105

Lead Time: 9-12Days

-- --
3900
Total: $
IRG7CH73K10EF
Infineon
IGBT 1200V ULTRA FAST DIE

Lead Time: 9-12Days

-- --
200
Total: $
BFC238371303
Vishay
CAP FILM 0.03UF 5% 2.5KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
5700
Total: $
BFC238370303
Vishay
CAP FILM 0.03UF 5% 2.5KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
4800
Total: $
IRG7CH73K10EF-R
Infineon
IGBT 1200V ULTRA FAST DIE

Lead Time: 9-12Days

-- --
4200
Total: $
BFC247990145
Vishay
CAP FILM 1.6UF 5% 250VDC RADIAL

MPQ: 350

Lead Time: 9-12Days

-- --
2300
Total: $
930C4W3K-F
Cornell Dubilier
CAP FILM 3UF 10% 400VDC AXIAL

Lead Time: 9-12Days

-- --
2400
Total: $
IRG7PH35U-EPBF
Infineon
IGBT 1200V ULTRA FAST TO247

Lead Time: 9-12Days

-- --
4100
Total: $
IRG7PH42UD-EPBF
Infineon
IGBT 1200V ULTRA FAST TO247

Lead Time: 9-12Days

-- --
8200
Total: $
930C2W4P7K-F
Cornell Dubilier
CAP FILM 4.7UF 10% 250VDC AXIAL

Lead Time: 9-12Days

-- --
5700
Total: $
IRG7PH50U-EP
Infineon
IGBT 1200V ULTRA FAST TO247

Lead Time: 9-12Days

-- --
800
Total: $
QAK2J225JTP
Nichicon
CAP FILM 2.2UF 5% 630VDC AXIAL

Lead Time: 9-12Days

-- --
4900
Total: $
BFC237326475
Vishay
CAP FILM 4.7UF 5% 100VDC RADIAL

MPQ: 350

Lead Time: 9-12Days

-- --
5900
Total: $
505PHB400K2J
Cornell Dubilier
CAP FILM 5UF 10% 400VDC RADIAL

Lead Time: 9-12Days

-- --
2800
Total: $
152MWS632KL
Cornell Dubilier
CAP FILM 1500PF 6.3KVDC AXIAL

Lead Time: 9-12Days

-- --
5800
Total: $
BFC238340823
Vishay
CAP FILM 0.082UF 5% 1.4KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
5700
Total: $
BFC247954914
Vishay
CAP FILM 0.91UF 5% 400VDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
5600
Total: $
  • 1
  • 4427
  • 4428
  • 4429
  • 4430
  • 4431
  • 6854
Go to