Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CC0603BRNPO9BN8R2
Yageo
MLCC 50V 8.2pF NP0 0603

Lead Time: 9-12Days

-- --
3100
Total: $
CC0603BRNPO9BN7R0
Yageo
MLCC 50V 7pF NP0 0603

Lead Time: 9-12Days

-- --
3900
Total: $
CC0402JRNPO7BN101
Yageo
MLCC 16V ±5% 100pF NP0 0402

Lead Time: 9-12Days

-- --
6100
Total: $
XL1509-3.3
Umw
DC-DC 3.3V

Lead Time: 9-12Days

-- --
1900
Total: $
1ED020I12-B2
Infineon
Single Isolated IGBT Gate Driver SO16

Lead Time: 9-12Days

-- --
1500
Total: $
ADS8588SIPMR
Texas Instruments
ADC ADS8588SIPMR

Lead Time: 9-12Days

-- --
3900
Total: $
RT0603BRD0768KL
Yageo
RES SMD 68K OHM 0.1% 1/10W 0603

Lead Time: 9-12Days

-- --
7300
Total: $
CC0603KRX7R9BB181
Yageo
MLCC 50V ±10% 180pF X7R 0603

Lead Time: 9-12Days

-- --
900
Total: $
CC0603KRX7R8BB333
Yageo
MLCC 25V ±10% 33nF X7R 0603

Lead Time: 9-12Days

-- --
7500
Total: $
CC0603KRNPO9BN470
Yageo
MLCC 50V ±10% 47pF NP0 0603

Lead Time: 9-12Days

-- --
7900
Total: $
CC0603KRX7R9BB393
Yageo
MLCC 50V ±10% 39nF X7R 0603

Lead Time: 9-12Days

-- --
8500
Total: $
CC0603KRNPO9BN150
Yageo
MLCC 50V ±10% 15pF NP0 0603

Lead Time: 9-12Days

-- --
9500
Total: $
CC0805KRX7R9BB681
Yageo
MLCC 50V ±10% 680pF X7R

Lead Time: 9-12Days

-- --
1500
Total: $
CC0603JRNPO8BN180
Yageo
MLCC 25V ±5% 18pF NP0 0603

Lead Time: 9-12Days

-- --
1900
Total: $
CC0603JRX7R9BB153
Yageo
MLCC 50V ±5% 15nF X7R 0603

Lead Time: 9-12Days

-- --
8300
Total: $
CC0603KRNPO9BN680
Yageo
MLCC 50V ±10% 68pF NP0 0603

Lead Time: 9-12Days

-- --
8900
Total: $
CC0603JRNPO8BN100
Yageo
CAP CER NPO 0603

Lead Time: 9-12Days

-- --
9500
Total: $
GRM155C81A225KE11D
Murata
MLCC 10V ±10% 2.2uF X6S 0402

Lead Time: 9-12Days

-- --
5100
Total: $
CC0603KRX7R8BB221
Yageo
MLCC 25V ±10% 220pF X7R 0603

Lead Time: 9-12Days

-- --
4700
Total: $
CC0603MRX7R9BB104
Yageo
MLCC 50V ±20% 100nF X7R 0603

Lead Time: 9-12Days

-- --
300
Total: $
  • 1
  • 439
  • 440
  • 441
  • 442
  • 443
  • 6854
Go to