Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SMBJ30CA
Dowo
ESD/TVS VRWM=30V VBRmin=33.3V VC=48.4V@IPP=12.4A SMB

Lead Time: 9-12Days

-- --
9100
Total: $
SMBJ24CA-AT/TR13
Yageo
TVS SMBJ24CA-AT/TR13 38.9V SMBDO-214AA

Lead Time: 9-12Days

-- --
5700
Total: $
SMAJ54A
Dowo

Lead Time: 9-12Days

-- --
6700
Total: $
SMAJ28A
Dowo
ESD/TVS VRWM=28V VBRmin=31.1V VC=45.4V@IPP=8.81A SMA

Lead Time: 9-12Days

-- --
2300
Total: $
SMAJ90A
Dowo
TVS 90V 2.74A

Lead Time: 9-12Days

-- --
3500
Total: $
SMD1812-030/60N
Bourns Inc.
/Fuse SMD1812-030/60N

Lead Time: 9-12Days

-- --
1300
Total: $
SMD3225-090N
Dowo

Lead Time: 9-12Days

-- --
8700
Total: $
SMCJ58CA
Dowo

Lead Time: 9-12Days

-- --
5500
Total: $
SRV05-4
Dowo

Lead Time: 9-12Days

-- --
5700
Total: $
XC6210B302MR-G
Torex Semiconductor Ltd.
PMIC---1--700mA-SOT-25

Lead Time: 9-12Days

-- --
1100
Total: $
SMD3216-090N
Dowo

Lead Time: 9-12Days

-- --
900
Total: $
AC0402JRNPO9BN220
Yageo
MLCC 50V ±5% 22pF NP0 0402

Lead Time: 9-12Days

-- --
6500
Total: $
AC0402JRNPO9BN180
Yageo
MLCC 50V ±5% 18pF NP0 0402

Lead Time: 9-12Days

-- --
9100
Total: $
CC0402KRX7R8BB273
Yageo
MLCC 25V ±10% 27nF X7R 0402

Lead Time: 9-12Days

-- --
5500
Total: $
CC0603BRNPO9BN8R0
Yageo
MLCC 50V 8pF NP0 0603

Lead Time: 9-12Days

-- --
300
Total: $
CC0603BRNPO9BN7R5
Yageo
MLCC 50V 7.5pF NP0 0603

Lead Time: 9-12Days

-- --
3100
Total: $
CC0402KRX5R5BB224
Yageo
MLCC 6.3V ±10% 220nF X5R

Lead Time: 9-12Days

-- --
6700
Total: $
CC0402MRX5R6BB105
Yageo
MLCC 10V ±20% 1uF X5R 0402

Lead Time: 9-12Days

-- --
7300
Total: $
CC0603KRX5R5BB105
Yageo
MLCC 6.3V ±10% 1uF X5R 0603

Lead Time: 9-12Days

-- --
9300
Total: $
CC0402FRNPO9BN390
Yageo
MLCC 50V ±1% 39pF NP0 0402

Lead Time: 9-12Days

-- --
9700
Total: $
  • 1
  • 436
  • 437
  • 438
  • 439
  • 440
  • 6854
Go to