Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CC0402KRX7R8BB221
Yageo
MLCC 25V ±10% 220pF X7R 0402

Lead Time: 9-12Days

-- --
5700
Total: $
CC0402KRNPO9BN470
Yageo
MLCC 50V ±10% 47pF NP0 0402

Lead Time: 9-12Days

-- --
6300
Total: $
CC0402KRNPO9BN101
Yageo
MLCC 50V ±10% 100pF NP0 0402

Lead Time: 9-12Days

-- --
6500
Total: $
CC0402JRX7R7BB103
Yageo
MLCC 16V ±5% 10nF X7R 0402

Lead Time: 9-12Days

-- --
1100
Total: $
CC0402JRX7R8BB104
Yageo
MLCC 25V ±5% 100nF X7R

Lead Time: 9-12Days

-- --
2900
Total: $
CC0402GRNPO9BN150
Yageo
MLCC 50V ±2% 15pF NP0 0402

Lead Time: 9-12Days

-- --
5100
Total: $
CC0402DRNPO9BN6R0
Yageo
MLCC 50V 6pF NP0 0402

Lead Time: 9-12Days

-- --
5300
Total: $
CC0402JRNPO9BN360
Yageo
MLCC 50V ±5% 36pF NP0 0402

Lead Time: 9-12Days

-- --
5900
Total: $
CC0402CRNPO9BN6R0
Yageo
MLCC 50V 6pF NP0 0402

Lead Time: 9-12Days

-- --
6300
Total: $
CC0402KRX7R7BB472
Yageo
MLCC 16V ±10% 4.7nF X7R 0402

Lead Time: 9-12Days

-- --
6700
Total: $
CC0402GRNPO9BN101
Yageo
MLCC 50V ±2% 100pF NP0 0402

Lead Time: 9-12Days

-- --
6900
Total: $
CC0402CRNPO9BN3R9
Yageo
MLCC 50V 3.9pF NP0

Lead Time: 9-12Days

-- --
7700
Total: $
CC0402KRX7R9BB201
Yageo
MLCC 50V ±10% 200pF X7R 0402

Lead Time: 9-12Days

-- --
8500
Total: $
CC0201JRNPO9BN270
Yageo
MLCC 50V ±5% 27pF NP0 0201

Lead Time: 9-12Days

-- --
5300
Total: $
CC0201JRNPO8BN101
Yageo
100 pF 25 V 0201 [0603] ± 5% C0G / NP0 CC Series

Lead Time: 9-12Days

-- --
5500
Total: $
CC0201KRX7R7BB102
Yageo
1000pF-±10%-16V--X7R-02010603-

Lead Time: 9-12Days

-- --
6100
Total: $
IPW95R310PFD7
Infineon
IPW95R310PFD7

Lead Time: 9-12Days

-- --
2700
Total: $
RT0603BRD074K02L
Yageo
RES SMD 4.02KOHM 0.1% 1/10W 0603

Lead Time: 9-12Days

-- --
500
Total: $
PT2512FK-7W0R1L
Yageo
2W 100mΩ ±1%

Lead Time: 9-12Days

-- --
8700
Total: $
UA78M33CKVURG3
Texas Instruments
LDO 25V 500mA 3.3V

Lead Time: 9-12Days

-- --
4100
Total: $
  • 1
  • 436
  • 437
  • 438
  • 439
  • 440
  • 6755
Go to