
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
BSS84DW_R1_00001
| Panjit |
MOSFET BSS84DW_R1_00001 SOT-363
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
BDFN2C2R51V
| Bourns Inc. |
BDFN2C2R51V
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
BSD3C151L
| Bourns Inc. |
BSD3C151L
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
BZT52C2V0S
| Dowo | Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| ||
ES1D(SOD-123FL)
| Dowo | Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| ||
MCR100-8 TO-92
| Jscj |
MCR100-8 TO-92 600V,800mA
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
MVR1210-390G
| Dowo |
MVR1210-390G
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
P6KE30CA
| Bourns Inc. |
TVS/ESD P6KE30CA DO15
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
SMAJ70CA
| Dowo | Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| ||
SMBJ30CA
| Dowo |
ESD/TVS VRWM=30V VBRmin=33.3V VC=48.4V@IPP=12.4A SMB
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
SMBJ24CA-AT/TR13
| Yageo |
TVS SMBJ24CA-AT/TR13 38.9V SMBDO-214AA
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
SMAJ54A
| Dowo | Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| ||
SMAJ28A
| Dowo |
ESD/TVS VRWM=28V VBRmin=31.1V VC=45.4V@IPP=8.81A SMA
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
SMAJ90A
| Dowo |
TVS 90V 2.74A
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
SMD1812-030/60N
| Bourns Inc. |
/Fuse SMD1812-030/60N
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
SMD3225-090N
| Dowo | Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| ||
SMCJ58CA
| Dowo | Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| ||
SRV05-4
| Dowo | Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| ||
XC6210B302MR-G
| Torex Semiconductor Ltd. |
PMIC---1--700mA-SOT-25
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
SMD3216-090N
| Dowo | Lead Time: 9-12Days | -- -- | 900 | Total:
$
|