
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
FGA50S110P
| Onsemi |
IGBT TRENCH FS 1100V 50A TO-3PN
| Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
HTSW-102-12-TM-D-RA
| Samtec |
CONN HEADER R/A 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 400 | Total:
$
| |
STGWA30H60DFB
| Stmicroelectronics |
IGBT TRENCH FS 600V 60A TO247
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
HTSW-102-12-T-D-RA
| Samtec |
CONN HEADER R/A 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
IKP20N60TAHKSA1
| Infineon |
IGBT TRENCH FS 600V 40A TO220-3
| MPQ: 500 Lead Time: 9-12Days | -- -- | 8400 | Total:
$
| |
MTSW-102-12-T-D-730-RA
| Samtec |
CONN HEADER R/A 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
AIKP20N60CTAKSA1
| Infineon |
IGBT TRENCH FS 600V 40A TO220-3
| MPQ: 500 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
HTSW-104-15-L-S
| Samtec |
CONN HEADER VERT 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 8400 | Total:
$
| |
STGWT30HP65FB
| Stmicroelectronics |
IGBT TRENCH FS 650V 60A TO-3P
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
HTSW-103-16-T-D
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
HTSW-103-15-T-D
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
AIKB15N65DH5ATMA1
| Infineon |
IGBT NPT 650V 15A TO263-3-2
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
HTSW-103-07-TM-D
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
AIKB15N65DF5ATMA1
| Infineon |
IGBT NPT 650V 15A TO263-3-2
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
HTSW-103-07-T-D
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
IRGB30B60KPBF
| Infineon |
IGBT NPT 600V 78A TO-220AB
| Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
HTSW-103-27-L-S
| Samtec |
CONN HEADER VERT 3POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
FGA20S125P-SN00336
| Onsemi |
IGBT TRENCH 1250V 40A TO-3PN
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
HTSW-103-16-G-S-RE
| Samtec |
CONN HEADER R/A 3POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
IRG4BC40SPBF
| Infineon |
IGBT 600V 60A TO-220AB
| Lead Time: 9-12Days | -- -- | 6600 | Total:
$
|