Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PI49FCT3807CHEX
Diodes Incorporated
IC CLK BUFFER 1:10 100MHZ 20SSOP

Lead Time: 9-12Days

-- --
8700
Total: $
542-DPK
Renesas
IC CLK BUFFER 1:2 156MHZ 8SOIC

Lead Time: 9-12Days

-- --
700
Total: $
HMTSW-104-22-T-S-409
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3300
Total: $
HMTSW-104-06-TM-S-080
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1700
Total: $
5P90011PGGI
Renesas
REAL TIME CLOCK REAL TIME CLOCK

Lead Time: 9-12Days

-- --
700
Total: $
HMTSW-104-06-T-S-150
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1600
Total: $
5P90011PGGI8
Renesas
IC CLOCK BUFFER MUX 1:4 24-TSSOP

Lead Time: 9-12Days

-- --
4000
Total: $
5T9302EJGI
Renesas
IC CLK BUFFER 2:2 450MHZ 20TSSOP

Lead Time: 9-12Days

-- --
3300
Total: $
HMTSW-104-06-T-S-080
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2500
Total: $
HMTSW-103-12-T-S-680-RA
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2200
Total: $
5T9304EJGI8
Renesas
IC CLK BUFFER 2:4 450MHZ 24TSSOP

Lead Time: 9-12Days

-- --
7300
Total: $
MTSW-102-22-T-D-330-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
5V2310PGG8
Renesas
IC CLK BUF 1:10 200MHZ 24TSSOP

Lead Time: 9-12Days

-- --
2500
Total: $
HTSW-103-24-LM-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
500
Total: $
ICS83940DYI
Renesas
IC CLK BUFFER 2:18 250MHZ 32TQFP

Lead Time: 9-12Days

-- --
9400
Total: $
HTSW-103-24-L-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8400
Total: $
851010AYILF
Renesas
IC CLK BUFFER 1:10 250MHZ 32TQFP

Lead Time: 9-12Days

-- --
300
Total: $
HTSW-103-23-LM-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1600
Total: $
HTSW-103-23-L-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4100
Total: $
HTSW-102-17-T-D
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6600
Total: $
  • 1
  • 4351
  • 4352
  • 4353
  • 4354
  • 4355
  • 6670
Go to