Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
RJH60D7DPQ-E0#T2
Renesas
IGBT TRENCH 600V 90A TO-247

Lead Time: 9-12Days

-- --
3000
Total: $
IRG4PH20KDPBF
Infineon
IGBT 1200V 11A TO-247AC

Lead Time: 9-12Days

-- --
2900
Total: $
AUIRG4PC40S-E
Infineon
IGBT 600V 60A TO247-3

MPQ: 400

Lead Time: 9-12Days

-- --
1100
Total: $
B32676G3226K000
Tdk
CAP FILM 22UF 10% 300VDC RADIAL

MPQ: 440

Lead Time: 9-12Days

-- --
4500
Total: $
RJH1CV7DPK-00#T0
Renesas
IGBT TRENCH 1200V 70A TO-3P

Lead Time: 9-12Days

-- --
6800
Total: $
MKP1847H56031JP2
Vishay
CAP FILM 6UF 5% 630VDC RADIAL

MPQ: 91

Lead Time: 9-12Days

-- --
800
Total: $
B32656S0684J564
Tdk
CAP FILM 0.68UF 5% 1KVDC SCREW

Lead Time: 9-12Days

-- --
9000
Total: $
IRGP4650D-EPBF
Infineon
IGBT 600V 76A TO-247AD

Lead Time: 9-12Days

-- --
2900
Total: $
NGTB30N120L2WG
Onsemi
IGBT 1200V 60A 534W TO247

Lead Time: 9-12Days

-- --
6500
Total: $
MKP385575025JKP2T0
Vishay
CAP FILM 7.5UF 5% 250VDC RADIAL

MPQ: 50

Lead Time: 9-12Days

-- --
8500
Total: $
STGW25S120DF3
Stmicroelectronics
IGBT TRENCH FS 1200V 50A TO-247

Lead Time: 9-12Days

-- --
1800
Total: $
MKP385575025JKM2T0
Vishay
CAP FILM 7.5UF 5% 250VDC RADIAL

MPQ: 50

Lead Time: 9-12Days

-- --
3100
Total: $
IRG7PH46UDPBF
Infineon
IGBT TRENCH 1200V 40A TO-247AC

Lead Time: 9-12Days

-- --
5800
Total: $
IRGP30B120KD-EP
Infineon
IGBT NPT 1200V 60A TO-247AD

Lead Time: 9-12Days

-- --
6500
Total: $
AUIRGP4063D-E
Infineon
IGBT TRENCH 600V 100A TO-247AD

Lead Time: 9-12Days

-- --
4900
Total: $
MKP385575025JKI2B0
Vishay
CAP FILM 7.5UF 5% 250VDC RADIAL

MPQ: 75

Lead Time: 9-12Days

-- --
7700
Total: $
APT40GP90BG
Microchip
IGBT PT 900V 100A TO247

Lead Time: 9-12Days

-- --
5000
Total: $
MKT1820633065
Vishay
CAP FILM 33UF 10% 63VDC RADIAL

MPQ: 110

Lead Time: 9-12Days

-- --
3400
Total: $
STGY50NC60WD
Stmicroelectronics
IGBT 600V 110A MAX247

MPQ: 30

Lead Time: 9-12Days

-- --
4600
Total: $
BFC230344335
Vishay
CAP FILM 3.3UF 5% 250VDC RADIAL

Lead Time: 9-12Days

-- --
1200
Total: $
  • 1
  • 4347
  • 4348
  • 4349
  • 4350
  • 4351
  • 6854
Go to