Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C0603C240G3GACTU
Kemet(Yageo)
CAP CER 24PF 25V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
2700
Total: $
C0603C200G3GACTU
Kemet(Yageo)
CAP CER 20PF 25V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
9500
Total: $
C0603C200D5GACTU
Kemet(Yageo)
CAP CER 20PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
3600
Total: $
C0603C160G5GACTU
Kemet(Yageo)
CAP CER 16PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
2500
Total: $
C0603C110C5GACTU
Kemet(Yageo)
CAP CER 11PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
3700
Total: $
C0603C510G5GACTU
Kemet(Yageo)
CAP CER 51PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
7300
Total: $
LD055A332JAB2A
Kyocera Avx Components
CAP CER 3300PF 50V NP0 0805

Lead Time: 9-12Days

-- --
4400
Total: $
LD055A222JAB2A
Kyocera Avx Components
CAP CER 2200PF 50V C0G/NP0 0805

MPQ: 6000

Lead Time: 9-12Days

-- --
9600
Total: $
RCER71E474K1M1H03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
3600
Total: $
RCER71E334K1M1H03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
4100
Total: $
RCER71E684K1M1H03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
6000
Total: $
RCER71E474K1DBH03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
1300
Total: $
RCER71E334K1DBH03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
9000
Total: $
RCER71E105K1DBH03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
2300
Total: $
RCER71E684K1DBH03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
9900
Total: $
GA1210Y563JBCAT31G
Vishay
CAP CER 0.056UF 200V X7R 1210

Lead Time: 9-12Days

-- --
3900
Total: $
GA1210Y563JBCAR31G
Vishay
CAP CER 0.056UF 200V X7R 1210

MPQ: 10000

Lead Time: 9-12Days

-- --
3000
Total: $
GA1210A271GBBAT31G
Vishay
CAP CER 270PF 100V C0G/NP0 1210

Lead Time: 9-12Days

-- --
5200
Total: $
GA1210A271GBBAR31G
Vishay
CAP CER 270PF 100V C0G/NP0 1210

MPQ: 10000

Lead Time: 9-12Days

-- --
3800
Total: $
GA1210A271GBAAT31G
Vishay
CAP CER 270PF 50V C0G/NP0 1210

Lead Time: 9-12Days

-- --
9300
Total: $
  • 1
  • 4332
  • 4333
  • 4334
  • 4335
  • 4336
  • 6670
Go to