Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
XC6210B302MR-G
Torex Semiconductor Ltd.
PMIC---1--700mA-SOT-25

Lead Time: 9-12Days

-- --
1100
Total: $
CC0603BRNPO9BN8R0
Yageo
MLCC 50V 8pF NP0 0603

Lead Time: 9-12Days

-- --
300
Total: $
CC0603BRNPO9BN7R5
Yageo
MLCC 50V 7.5pF NP0 0603

Lead Time: 9-12Days

-- --
3100
Total: $
CC0603JRX7R9BB471
Yageo
MLCC 50V ±5% 470pF X7R 0603

Lead Time: 9-12Days

-- --
4100
Total: $
CC0603JRX7R9BB221
Yageo
MLCC 50V ±5% 220pF X7R 0603

Lead Time: 9-12Days

-- --
4700
Total: $
CC0402MRX5R6BB105
Yageo
MLCC 10V ±20% 1uF X5R 0402

Lead Time: 9-12Days

-- --
7300
Total: $
CC0402BRNPO9BN3R0
Yageo
MLCC 50V 3pF NP0 0402

Lead Time: 9-12Days

-- --
4900
Total: $
CC0402FRNPO9BN360
Yageo
MLCC 50V ±1% 36pF NP0 0402

Lead Time: 9-12Days

-- --
5300
Total: $
CC0402KRX7R8BB273
Yageo
MLCC 25V ±10% 27nF X7R 0402

Lead Time: 9-12Days

-- --
5500
Total: $
CC0402BRNPO9BN7R0
Yageo
MLCC 50V 7pF NP0 0402

Lead Time: 9-12Days

-- --
700
Total: $
CC0402KRX5R5BB224
Yageo
MLCC 6.3V ±10% 220nF X5R

Lead Time: 9-12Days

-- --
6700
Total: $
CC0402FRNPO9BN390
Yageo
MLCC 50V ±1% 39pF NP0 0402

Lead Time: 9-12Days

-- --
9700
Total: $
CC0402BRNPO9BN2R4
Yageo
MLCC 50V 2.4pF NP0 0402

Lead Time: 9-12Days

-- --
6900
Total: $
CC0805JRNPOBBN100
Yageo
MLCC 500V ±5% 10pF NP0

Lead Time: 9-12Days

-- --
5100
Total: $
CC0805JRX7R8BB104
Yageo
MLCC 25V ±5% 100nF X7R 0805

Lead Time: 9-12Days

-- --
100
Total: $
CC0805JRNPOBBN220
Yageo
MLCC 500V ±5% 22pF NP0

Lead Time: 9-12Days

-- --
500
Total: $
CC0603MRY5V8BB104
Yageo
MLCC 25V ±20% 100nF Y5V 0603

Lead Time: 9-12Days

-- --
3700
Total: $
CC0402GRNPO9BN120
Yageo
MLCC 50V ±2% 12pF NP0 0402

Lead Time: 9-12Days

-- --
5900
Total: $
CC0805JRNPO9BN820
Yageo
MLCC 50V ±5% 82pF NP0 0805

Lead Time: 9-12Days

-- --
7900
Total: $
CC0805JRNPO9BN750
Yageo
MLCC 50V ±5% 75pF NP0

Lead Time: 9-12Days

-- --
8100
Total: $
  • 1
  • 430
  • 431
  • 432
  • 433
  • 434
  • 6755
Go to