
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
BFP760H6327
| Infineon |
BJT 240mW 4V 70mA NPN SOT-343
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
BDFN2C121V
| Bourns Inc. |
BDFN2C121V
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
FXL1360-101-M
| Cjiang |
3.5A 100uH ±20% 2.5A SMD,12.6x13.5mm
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
FTC201210S1R0MBCA
| Cjiang |
4A 1uH ±20% 3.9A SMD,1.2x2mm
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
FTC404030S1R0MGCA
| Cjiang | Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| ||
FTC160808S2R2MBCA
| Cjiang |
1.5A 2.2uH ±20% 1.4A SMD,0.8x1.6mm
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
FTC404020S2R2MGCA
| Cjiang | Lead Time: 9-12Days | -- -- | 100 | Total:
$
| ||
FPV201209E260PKT
| Fh |
0805 26V ±10% 650pF
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
FNR4012S100MT
| Cjiang |
1.1A 10uH ±20% 1A SMD,4x4mm
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
PESD5Z5.0-N
| Bourns Inc. |
ESDIPP=15A VC=13V SOD523
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
SMBJ100CA
| Dowo |
TVS SMB Ppp=600W VC=162V Ipp=3.7A VRWM=100V
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
SMAJ3.3A
| Dowo | Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| ||
SMAJ22A
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| ||
TK6A80E,S4X(S
| Toshiba |
MOSFET N 800 V 6 A 1.35 ohm TO-220SIS
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
2RM470L-8/B
| Yageo | Lead Time: 9-12Days | -- -- | 700 | Total:
$
| ||
AO3400NSA
| Dowo |
FET AO3400NSA
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
BWF102N
| Bourns Inc. |
1000V 3kA 2 GDT
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
BSD3C301V
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| ||
TB5128FTG(CP,EL)
| Toshiba | Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| ||
BZT52C7V5
| Dowo | Lead Time: 9-12Days | -- -- | 7300 | Total:
$
|