Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BFC237882562
Vishay
CAP FILM 5600PF 5% 1.6KVDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
8800
Total: $
BFC238370112
Vishay
CAP FILM 1100PF 5% 2.5KVDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
3900
Total: $
TSM-104-01-TM-SV-TR
Samtec
CONN HEADER SMD 4POS 2.54MM

MPQ: 350

Lead Time: 9-12Days

-- --
700
Total: $
BFC233861683
Vishay
CAP FILM 0.068UF 10% 1KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
9900
Total: $
TSM-102-01-LM-SH-TR
Samtec
CONN HEADER SMD R/A 2POS 2.54MM

MPQ: 675

Lead Time: 9-12Days

-- --
3500
Total: $
B32524Q3106J
Tdk
CAP FILM 10UF 5% 250VDC RADIAL

MPQ: 800

Lead Time: 9-12Days

-- --
600
Total: $
FTR-102-01-T-D-TR
Samtec
CONN HEADER SMD 4POS 1.27MM

MPQ: 350

Lead Time: 9-12Days

-- --
7100
Total: $
MKP385518016JIP2T0
Vishay
CAP FILM 1.8UF 5% 160VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
6700
Total: $
MKP385518016JIM2T0
Vishay
CAP FILM 1.8UF 5% 160VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
1100
Total: $
TSM-102-01-L-SH-TR
Samtec
CONN HEADER SMD R/A 2POS 2.54MM

MPQ: 675

Lead Time: 9-12Days

-- --
5600
Total: $
F1778433M3ICT0
Vishay
CAP FILM 0.33UF 20% 630VDC RAD

MPQ: 235

Lead Time: 9-12Days

-- --
4500
Total: $
PEC03SZAN
Sullins Connector Solutions
CONN HEADER VERT 3POS 2.54MM

Lead Time: 9-12Days

-- --
9400
Total: $
DF33R-2P-3.3DSA(24)
Hirose Electric Co.,Ltd.
CONN HEADER VERT 2POS 3.3MM

MPQ: 135

Lead Time: 9-12Days

-- --
9900
Total: $
F1778433M3IBT0
Vishay
CAP FILM 0.33UF 20% 630VDC RAD

MPQ: 235

Lead Time: 9-12Days

-- --
3000
Total: $
BFC238333393
Vishay
CAP FILM 0.039UF 5% 1KVDC RADIAL

MPQ: 550

Lead Time: 9-12Days

-- --
1000
Total: $
TSM-104-01-T-SV-TR
Samtec
CONN HEADER SMD 4POS 2.54MM

MPQ: 350

Lead Time: 9-12Days

-- --
200
Total: $
BFC238333303
Vishay
CAP FILM 0.03UF 5% 1KVDC RADIAL

MPQ: 700

Lead Time: 9-12Days

-- --
8800
Total: $
2-1445089-2
Te Connectivity
CONN HEADER R/A 2POS 3MM

Lead Time: 9-12Days

-- --
8800
Total: $
BFC238323134
Vishay
CAP FILM 0.13UF 5% 630VDC RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
800
Total: $
826652-6
Te Connectivity
CONN HEADER R/A 6POS 2.54MM

Lead Time: 9-12Days

-- --
6300
Total: $
  • 1
  • 4171
  • 4172
  • 4173
  • 4174
  • 4175
  • 6670
Go to