Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
B32654A0105K000
Tdk
CAP FILM 1UF 10% 1KVDC RADIAL

MPQ: 180

Lead Time: 9-12Days

-- --
6200
Total: $
68000-217HLF
Amphenol
CONN HEADER VERT 17POS 2.54MM

Lead Time: 9-12Days

-- --
7600
Total: $
B32654A0105J000
Tdk
CAP FILM 1UF 5% 1KVDC RADIAL

MPQ: 180

Lead Time: 9-12Days

-- --
5500
Total: $
95293-102-06LF
Amphenol
CONN HEADER SMD 6POS 2.54MM

Lead Time: 9-12Days

-- --
2900
Total: $
WMF6P1K-F
Cornell Dubilier
CAP FILM 0.1UF 10% 630VDC AXIAL

Lead Time: 9-12Days

-- --
7300
Total: $
77311-102-10LF
Amphenol
CONN HEADER VERT 10POS 2.54MM

Lead Time: 9-12Days

-- --
400
Total: $
BFC241962204
Vishay
CAP FILM 0.22UF 5% 400VDC RADIAL

MPQ: 750

Lead Time: 9-12Days

-- --
4600
Total: $
BFC241765104
Vishay
CAP FILM 0.51UF 5% 160VDC RADIAL

MPQ: 750

Lead Time: 9-12Days

-- --
7400
Total: $
M20-9721045
Harwin
CONN HEADER VERT 20POS 2.54MM

MPQ: 500

Lead Time: 9-12Days

-- --
500
Total: $
BFC241705104
Vishay
CAP FILM 0.51UF 5% 160VDC RADIAL

MPQ: 800

Lead Time: 9-12Days

-- --
7100
Total: $
0026503129
Molex
CONN HEADER VERT 12POS 3.96MM

Lead Time: 9-12Days

-- --
8900
Total: $
BFC241666204
Vishay
CAP FILM 0.62UF 5% 63VDC RADIAL

MPQ: 750

Lead Time: 9-12Days

-- --
8600
Total: $
009067031000801+
Kyocera Avx Components
CONN RCPT

Lead Time: 9-12Days

-- --
9800
Total: $
BFC241911804
Vishay
CAP FILM 0.18UF 2% 400VDC RADIAL

MPQ: 800

Lead Time: 9-12Days

-- --
2900
Total: $
009067033000801+
Kyocera Avx Components
CONN RCPT

Lead Time: 9-12Days

-- --
8100
Total: $
BFC241971804
Vishay
CAP FILM 0.18UF 2% 400VDC RADIAL

MPQ: 750

Lead Time: 9-12Days

-- --
5700
Total: $
146285-5
Te Connectivity
CONN HEADER VERT 5POS 2.54MM

Lead Time: 9-12Days

-- --
3200
Total: $
BFC238371112
Vishay
CAP FILM 1100PF 5% 2.5KVDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
200
Total: $
BFC237884562
Vishay
CAP FILM 5600PF 5% 1.6KVDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
6000
Total: $
350-80-108-01-899101
Preci-Dip
CONN HEADER SMD 8POS 2.54MM

MPQ: 1250

Lead Time: 9-12Days

-- --
4100
Total: $
  • 1
  • 4170
  • 4171
  • 4172
  • 4173
  • 4174
  • 6670
Go to