Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
74FCT807CTQG8
Renesas
IC CLK BUFFER 1:10 100MHZ 20QSOP

Lead Time: 9-12Days

-- --
8500
Total: $
HTSW-202-19-TM-S
Samtec
CONN HEADER VERT 2POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
MTSW-104-10-T-S-530-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6300
Total: $
74FCT807CTQGI
Renesas
IC CLK BUFFER 1:10 100MHZ 20QSOP

Lead Time: 9-12Days

-- --
1000
Total: $
MTSW-104-10-T-S-380-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3300
Total: $
74FCT807CTQGI8
Renesas
IC CLK BUFFER 1:10 100MHZ 20QSOP

Lead Time: 9-12Days

-- --
1300
Total: $
HTSW-202-14-L-S
Samtec
CONN HEADER VERT 2POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
5000
Total: $
IDT74FCT807CTQI
Renesas
IC CLK BUFFER 1:10 100MHZ 20QSOP

Lead Time: 9-12Days

-- --
8600
Total: $
HTSW-104-12-T-S
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6400
Total: $
HTSW-104-14-L-S
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9500
Total: $
HTSW-104-08-L-S
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5300
Total: $
MTSW-102-10-T-D-530-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8400
Total: $
IDT74FCT807CTSO
Renesas
IC CLK BUFFER 1:10 100MHZ 20SOIC

Lead Time: 9-12Days

-- --
4900
Total: $
MTSW-102-10-T-D-510-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7100
Total: $
HTSW-103-14-T-D
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
HTSW-103-19-L-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
74FCT807CTSOG
Renesas
IC CLK BUFFER 1:10 100MHZ 20SOIC

Lead Time: 9-12Days

-- --
4500
Total: $
74FCT807CTSOG8
Renesas
IC CLK BUFFER 1:10 100MHZ 20SOIC

Lead Time: 9-12Days

-- --
9200
Total: $
74FCT807CTSOGI
Renesas
IC CLK BUFFER 1:10 100MHZ 20SOIC

Lead Time: 9-12Days

-- --
1500
Total: $
MTSW-103-10-L-S-530-RA
Samtec
CONN HEADER R/A 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7000
Total: $
  • 1
  • 4104
  • 4105
  • 4106
  • 4107
  • 4108
  • 6670
Go to