Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
5T93GL06NLGI8
Renesas
IC CLK BUF 2:6 800MHZ 28VFQFPN

Lead Time: 9-12Days

-- --
7300
Total: $
TSW-102-22-S-S-NA
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2500
Total: $
5T93GL10NLGI
Renesas
IC CLK BUF 2:10 650MHZ 40VFQFPN

Lead Time: 9-12Days

-- --
7500
Total: $
TSW-102-08-L-D-NA
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7800
Total: $
TSW-102-08-H-S-RA
Samtec
CONN HEADER R/A 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5900
Total: $
TSW-102-08-F-D-NA
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6800
Total: $
TSW-102-06-H-S
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4500
Total: $
TSW-102-05-H-S
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
TSW-101-19-G-Q
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
8000
Total: $
TSW-101-16-L-D-LL
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
4200
Total: $
IDT5V2305PGI
Renesas
IC CLK BUFFER 1:5 200MHZ 16TSSOP

Lead Time: 9-12Days

-- --
3700
Total: $
IDT5V2305PGI8
Renesas
IC CLK BUFFER 1:5 200MHZ 16TSSOP

Lead Time: 9-12Days

-- --
5100
Total: $
TSW-101-08-F-D-LL
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
3800
Total: $
IDT5V2310PGI
Renesas
IC CLK BUF 1:10 200MHZ 24TSSOP

Lead Time: 9-12Days

-- --
2900
Total: $
TSW-101-07-F-D-LL
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
8700
Total: $
IDT5V2310PGI8
Renesas
IC CLK BUF 1:10 200MHZ 24TSSOP

Lead Time: 9-12Days

-- --
3900
Total: $
TMM-103-06-T-S-SM
Samtec
2MM TERMINAL STRIP

MPQ: 98

Lead Time: 9-12Days

-- --
6200
Total: $
IDT5V551DCGI
Renesas
IC CLK BUFFER 1:4 160MHZ 8SOIC

Lead Time: 9-12Days

-- --
3000
Total: $
TMM-103-06-F-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
3600
Total: $
IDT5V551DCI
Renesas
IC CLK BUFFER 1:4 160MHZ 8SOIC

Lead Time: 9-12Days

-- --
7100
Total: $
  • 1
  • 4095
  • 4096
  • 4097
  • 4098
  • 4099
  • 6670
Go to