Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MC10E211FNR2
Onsemi
IC CLK BUFFER 2:6 700MHZ 28PLCC

Lead Time: 9-12Days

-- --
4100
Total: $
MKP385522025JIM2T0
Vishay
CAP FILM 2.2UF 5% 250VDC RADIAL

MPQ: 150

Lead Time: 9-12Days

-- --
200
Total: $
MKP383422100JKI2B0
Vishay
CAP FILM 0.22UF 5% 1KVDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
5400
Total: $
MKP383410140JKI2B0
Vishay
CAP FILM 0.1UF 5% 1.4KVDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
9700
Total: $
MC10EP11DTR2
Onsemi
IC CLK BUFFER 1:2 3GHZ 8TSSOP

Lead Time: 9-12Days

-- --
9800
Total: $
MC10LVEP11DTR2
Onsemi
IC CLK BUFFER 1:2 3GHZ 8TSSOP

Lead Time: 9-12Days

-- --
6800
Total: $
MKP383351200JKI2B0
Vishay
CAP FILM 0.051UF 5% 2KVDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
6100
Total: $
MC10LVEP11DTR2G
Onsemi
IC CLK BUFFER 1:2 3GHZ 8TSSOP

Lead Time: 9-12Days

-- --
5600
Total: $
NB6L11DR2
Onsemi
IC CLK BUFFER 1:2 6GHZ 8SOIC

Lead Time: 9-12Days

-- --
8000
Total: $
MKP385522025JII2B0
Vishay
CAP FILM 2.2UF 5% 250VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
6600
Total: $
NB6L11DTR2
Onsemi
IC CLK BUFFER 1:2 6GHZ 8TSSOP

Lead Time: 9-12Days

-- --
9800
Total: $
NB7L111MMNR2
Onsemi
IC CLK BUFFER 2:10 5.5GHZ 52QFN

Lead Time: 9-12Days

-- --
3300
Total: $
MKP383422100JKP2T0
Vishay
CAP FILM 0.22UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
300
Total: $
NB7L11MMN
Onsemi
IC CLK BUFFER 1:2 8GHZ 16QFN

Lead Time: 9-12Days

-- --
6800
Total: $
NB7L11MMNR2
Onsemi
IC CLK BUFFER 1:2 8GHZ 16QFN

Lead Time: 9-12Days

-- --
300
Total: $
MKP383422100JKM2T0
Vishay
CAP FILM 0.22UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
2500
Total: $
NB7L14MMN
Onsemi
IC CLK BUFFER 1:4 8GHZ 16QFN

Lead Time: 9-12Days

-- --
8500
Total: $
NB7L14MMNR2
Onsemi
IC CLK BUFFER 1:4 8GHZ 16QFN

Lead Time: 9-12Days

-- --
3300
Total: $
MKP383410140JKP2T0
Vishay
CAP FILM 0.1UF 5% 1.4KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
6000
Total: $
MKP383410140JKM2T0
Vishay
CAP FILM 0.1UF 5% 1.4KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
4900
Total: $
  • 1
  • 4076
  • 4077
  • 4078
  • 4079
  • 4080
  • 6670
Go to