Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CY29948AXI
Infineon
IC CLK BUFFER 2:12 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
7400
Total: $
BFC233626474
Vishay
CAP FILM 0.47UF 20% 630VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
2400
Total: $
CY29948AXIT
Infineon
IC CLK BUFFER 2:12 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
8500
Total: $
BFC237368394
Vishay
CAP FILM 0.39UF 5% 630VDC RADIAL

MPQ: 700

Lead Time: 9-12Days

-- --
4100
Total: $
BFC230364274
Vishay
CAP FILM 0.27UF 5% 630VDC RADIAL

Lead Time: 9-12Days

-- --
7100
Total: $
CY2CC910OXIT
Infineon
IC CLK BUFFER 1:10 650MHZ 20SSOP

Lead Time: 9-12Days

-- --
5000
Total: $
BFC237358684
Vishay
CAP FILM 0.68UF 5% 400VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
1500
Total: $
CY7B991-2JXCT
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
9500
Total: $
CY7B991-5JXCT
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
9800
Total: $
CY7B991-5JXI
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
5200
Total: $
CY7B991-5JXIT
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
8300
Total: $
BFC237356684
Vishay
CAP FILM 0.68UF 5% 400VDC RADIAL

MPQ: 350

Lead Time: 9-12Days

-- --
1600
Total: $
CY7B991-7JXCT
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
200
Total: $
BFC237345125
Vishay
CAP FILM 1.2UF 10% 250VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
9400
Total: $
CY7B991V-5JXC
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
4700
Total: $
BFC233916824
Vishay
CAP FILM 0.82UF 10% 630VDC RAD

MPQ: 350

Lead Time: 9-12Days

-- --
2500
Total: $
CY7B991V-5JXI
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
0
Total: $
CY7B991V-5JXIT
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
3600
Total: $
BFC246860184
Vishay
CAP FILM 0.18UF RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
9100
Total: $
CY7B991V-7JXCT
Infineon
IC CLK BUFFER 8:8 80MHZ 32PLCC

Lead Time: 9-12Days

-- --
7800
Total: $
  • 1
  • 4074
  • 4075
  • 4076
  • 4077
  • 4078
  • 6670
Go to