Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PI90LV211QE
Diodes Incorporated
IC CLK BUFFER 2:6 250MHZ 28QSOP

Lead Time: 9-12Days

-- --
6800
Total: $
BFC237892103
Vishay
CAP FILM 10000PF 5% 2KVDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
4600
Total: $
MKP1839522163
Vishay
CAP FILM 2.2UF 2.5% 160VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
4300
Total: $
PI90LVT211QE
Diodes Incorporated
IC CLK BUFFER 2:6 250MHZ 28QSOP

Lead Time: 9-12Days

-- --
5100
Total: $
BFC230351125
Vishay
CAP FILM 1.2UF 10% 400VDC RADIAL

Lead Time: 9-12Days

-- --
9200
Total: $
CY29940AXIT
Infineon
IC CLK BUFFER 1:18 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
4200
Total: $
BFC230346185
Vishay
CAP FILM 1.8UF 5% 250VDC RADIAL

Lead Time: 9-12Days

-- --
5900
Total: $
CY29942AXIT
Infineon
IC CLK BUFFER 1:18 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
4900
Total: $
MKP1845410106
Vishay
CAP FILM 0.1UF 20% 1KVDC AXIAL

MPQ: 750

Lead Time: 9-12Days

-- --
7300
Total: $
CY29946AXC
Infineon
IC CLK BUFFER 2:10 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
7500
Total: $
CY29946AXCT
Infineon
IC CLK BUFFER 2:10 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
5600
Total: $
B32656A8224J000
Tdk
CAP FILM 0.22UF 5% 850VDC RADIAL

MPQ: 1620

Lead Time: 9-12Days

-- --
6000
Total: $
CY29946AXI
Infineon
IC CLK BUFFER 2:10 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
6200
Total: $
CY29946AXIT
Infineon
IC CLK BUFFER 2:10 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
7500
Total: $
MKP1841410135M
Vishay
CAP FILM 0.1UF 10% 1.6KVDC RAD

MPQ: 110

Lead Time: 9-12Days

-- --
3500
Total: $
CY29947AXC
Infineon
IC CLK BUFFER 2:9 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
6600
Total: $
MKP1841410134M
Vishay
CAP FILM 0.1UF 5% 1.6KVDC RADIAL

MPQ: 110

Lead Time: 9-12Days

-- --
6300
Total: $
CY29947AXI
Infineon
IC CLK BUFFER 2:9 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
1700
Total: $
CY29947AXIT
Infineon
IC CLK BUFFER 2:9 200MHZ 32TQFP

Lead Time: 9-12Days

-- --
8000
Total: $
MKT1820468634
Vishay
CAP FILM 0.68UF 5% 630VDC RADIAL

MPQ: 110

Lead Time: 9-12Days

-- --
6900
Total: $
  • 1
  • 4073
  • 4074
  • 4075
  • 4076
  • 4077
  • 6670
Go to