Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
49FCT805CTSOG8
Renesas
IC CLK BUFFER 1:5 20SOIC

Lead Time: 9-12Days

-- --
9200
Total: $
0603Y0508P20DFT
Knowles
CAP CER 8.2PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
3300
Total: $
49FCT805PYG8
Renesas
IC CLK BUFFER 1:5 20SSOP

Lead Time: 9-12Days

-- --
900
Total: $
0603Y0508P20DAT
Knowles
CAP CER 8.2PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
6200
Total: $
PI49FCT20807QE
Diodes Incorporated
IC CLK BUFFER 1:10 150MHZ 20QSOP

MPQ: 55

Lead Time: 9-12Days

-- --
4200
Total: $
0603Y0506P80DFT
Knowles
CAP CER 6.8PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
4100
Total: $
0603Y0506P80DAT
Knowles
CAP CER 6.8PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
8000
Total: $
0603Y0505P60DFT
Knowles
CAP CER 5.6PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
2700
Total: $
PI6C4911505-04LIEX
Diodes Incorporated
IC CLK BUFFER 2:5 1.5GHZ 20TSSOP

MPQ: 3000

Lead Time: 9-12Days

-- --
2200
Total: $
PI6C4911505-07LIEX
Diodes Incorporated
IC CLK BUFFER 2:5 1.5GHZ 20TSSOP

MPQ: 3000

Lead Time: 9-12Days

-- --
5500
Total: $
0603Y0505P60DAT
Knowles
CAP CER 5.6PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
2300
Total: $
PI6C41204LE
Diodes Incorporated
IC CLK BUFFER 2:4 266MHZ 20TSSOP

Lead Time: 9-12Days

-- --
3100
Total: $
0603Y0504P70DAT
Knowles
CAP CER 4.7PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
100
Total: $
0603Y0503P90DFT
Knowles
CAP CER 3.9PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
7900
Total: $
9112AM-27LFT
Renesas
IC CLK BUFFER 1:4 140MHZ 8SOIC

Lead Time: 9-12Days

-- --
1400
Total: $
0603Y0503P90DAT
Knowles
CAP CER 3.9PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
8800
Total: $
49FCT805CTQG
Renesas
IC CLK BUFFER 1:5 20QSOP

Lead Time: 9-12Days

-- --
7800
Total: $
0603Y0503P30DFT
Knowles
CAP CER 3.3PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
2000
Total: $
83905AMLFT
Renesas
IC CLK BUFFER 1:6 100MHZ 16SOIC

Lead Time: 9-12Days

-- --
8300
Total: $
PI6C4911510FAEIE
Diodes Incorporated
IC CLK BUFFER 2:10 1.5GHZ 32TQFP

MPQ: 250

Lead Time: 9-12Days

-- --
7800
Total: $
  • 1
  • 4001
  • 4002
  • 4003
  • 4004
  • 4005
  • 6670
Go to