Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FRC0805J304 TS
Fojan
0805 300KΩ ±5% 1/8W

Lead Time: 9-12Days

-- --
6500
Total: $
FRC1210J121 TS
Fojan
333.333mW 120Ω ±5% 1210

Lead Time: 9-12Days

-- --
7500
Total: $
FRC0805J563 TS
Fojan
125mW 56kΩ ±5% 0805

Lead Time: 9-12Days

-- --
7700
Total: $
FRC1206J124 TS
Fojan
250mW 120kΩ ±5% 1206

Lead Time: 9-12Days

-- --
1100
Total: $
FRC1206F24R0TS
Fojan
250mW 24Ω ±1% 1206

Lead Time: 9-12Days

-- --
1300
Total: $
FRC0805F4300TS
Fojan
125mW 430Ω ±1% 0805

Lead Time: 9-12Days

-- --
5900
Total: $
FRC0805F3601TS
Fojan
125mW 3.6kΩ ±1% 0805

Lead Time: 9-12Days

-- --
500
Total: $
FRC1812P000 TS
Fojan
1812 0Ω ±5% 3/4W

Lead Time: 9-12Days

-- --
1300
Total: $
FRC0805F1200TS
Fojan
125mW 120Ω ±1% 0805

Lead Time: 9-12Days

-- --
6100
Total: $
FRC1206J224 TS
Fojan
250mW 220kΩ ±5% 1206

Lead Time: 9-12Days

-- --
8500
Total: $
FRC1206F4990TS
Fojan
250mW 499Ω ±1% 1206

Lead Time: 9-12Days

-- --
8700
Total: $
FRC1206J682 TS
Fojan
250mW 6.8kΩ ±5% 1206

Lead Time: 9-12Days

-- --
8900
Total: $
FRC0805F43R0TS
Fojan
125mW 43Ω ±1% 0805

Lead Time: 9-12Days

-- --
9100
Total: $
FRC1206J222 TS
Fojan
250mW 2.2kΩ ±5% 1206

Lead Time: 9-12Days

-- --
9500
Total: $
FRC0805F1601TS
Fojan
0805 1.6KΩ ±1% 1/8W

Lead Time: 9-12Days

-- --
500
Total: $
FRC0805J682 TS
Fojan
125mW 6.8kΩ ±5% 0805

Lead Time: 9-12Days

-- --
1500
Total: $
FRC0805F9102TS
Fojan
125mW 91kΩ ±1% 0805

Lead Time: 9-12Days

-- --
1700
Total: $
FRC0805J333 TS
Fojan
0805 33KΩ ±5% 1/8W

Lead Time: 9-12Days

-- --
5700
Total: $
FRC2512J221 TS
Fojan
2512 220Ω ±5% 1W

Lead Time: 9-12Days

-- --
6500
Total: $
FRC0603J564 TS
Fojan
100mW 560kΩ ±5% 0603

Lead Time: 9-12Days

-- --
7900
Total: $
  • 1
  • 37
  • 38
  • 39
  • 40
  • 41
  • 6854
Go to