Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
82V3155PVG
Renesas
IC PLL WAN T1/E1/OC3 DUAL 56SSOP

Lead Time: 9-12Days

-- --
2100
Total: $
BFC238320164
Vishay
CAP FILM 0.16UF 5% 630VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
6800
Total: $
82V3155PVG8
Renesas
IC PLL WAN T1/E1/OC3 DUAL 56SSOP

Lead Time: 9-12Days

-- --
4500
Total: $
82V3355TFG
Renesas
IC PLL WAN SYNC ETH 64-TQFP

Lead Time: 9-12Days

-- --
4500
Total: $
BFC246851335
Vishay
CAP FILM 3.3UF 10% 100VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
900
Total: $
82V3355TFG8
Renesas
IC PLL WAN SYNC ETH 64-TQFP

Lead Time: 9-12Days

-- --
7800
Total: $
BFC246804335
Vishay
CAP FILM 3.3UF 10% 100VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
400
Total: $
MKP1845410134
Vishay
CAP FILM 0.1UF 5% 1.6KVDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
6600
Total: $
MKP383351250JKP2T0
Vishay
CAP FILM 0.051UF 5% 2.5KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
6500
Total: $
CSPT855PG
Renesas
IC CLK BUF DDR 220MHZ 1CIRC

Lead Time: 9-12Days

-- --
4600
Total: $
MKT1813468634
Vishay
CAP FILM 0.68UF 5% 630VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
2800
Total: $
F339MX244731JKI2B0
Vishay
CAP FILM 0.47UF 5% 630VDC RADIAL

MPQ: 150

Lead Time: 9-12Days

-- --
7000
Total: $
F339MX244731JKP2T0
Vishay
CAP FILM 0.47UF 5% 630VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
3800
Total: $
CSPT855PGG
Renesas
IC CLK BUF DDR 220MHZ 1CIRC

Lead Time: 9-12Days

-- --
5500
Total: $
F339MX244731JKM2T0
Vishay
CAP FILM 0.47UF 5% 630VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
1000
Total: $
CSPT855PGGI
Renesas
IC CLK BUF DDR 220MHZ 1CIRC

Lead Time: 9-12Days

-- --
5700
Total: $
B32756C2805K000
Tdk
CAP FILM 8UF 10% 500VDC RADIAL

MPQ: 720

Lead Time: 9-12Days

-- --
1100
Total: $
B32656J1154J000
Tdk
CAP FILM 5% 1.6KVDC RADIAL

MPQ: 1380

Lead Time: 9-12Days

-- --
3900
Total: $
CSPT855PGI
Renesas
IC CLK BUF DDR 220MHZ 1CIRC

Lead Time: 9-12Days

-- --
2600
Total: $
MKP1848S55070JK2B
Vishay
CAP FILM 5UF 5% 700VDC RADIAL

MPQ: 90

Lead Time: 9-12Days

-- --
7200
Total: $
  • 1
  • 3870
  • 3871
  • 3872
  • 3873
  • 3874
  • 6670
Go to