Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C951U472MVVDCAWL40
Kemet(Yageo)
CAP CER 4700PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
1100
Total: $
C951U472MVVDCAWL35
Kemet(Yageo)
CAP CER 4700PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
7600
Total: $
C941U332MUVDCA7317
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
3600
Total: $
C941U332MUVDAA7317
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
4600
Total: $
C941U332MUVDAAWL20
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
7900
Total: $
C941U332MUVDAAWL45
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
2100
Total: $
C941U332MUVDCAWL40
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
9100
Total: $
932S401EFLF
Renesas
IC TIMING CTRL HUB PROGR 56-SSOP

Lead Time: 9-12Days

-- --
3600
Total: $
C941U332MUVDBAWL40
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
2700
Total: $
C941U332MUVDCAWL35
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
5900
Total: $
932S401EGLFT
Renesas
IC TIMING CTRL HUB PROGR 56TSSOP

Lead Time: 9-12Days

-- --
7800
Total: $
C941U332MUVDBAWL35
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
7300
Total: $
932S421BFLF
Renesas
IC PCIE GEN2 MAIN CLOCK 56-SSOP

Lead Time: 9-12Days

-- --
0
Total: $
C941U332MUVDBA7317
Kemet(Yageo)
CAP CER 3300PF 400VAC Y5V RADIAL

Lead Time: 9-12Days

-- --
7600
Total: $
LD105C104JAB2A
Kyocera Avx Components
CAP CER 0.1UF 50V X7R 1210

MPQ: 8000

Lead Time: 9-12Days

-- --
3300
Total: $
LD101C104JAB2A
Kyocera Avx Components
CAP CER 0.1UF 100V X7R 1210

MPQ: 8000

Lead Time: 9-12Days

-- --
4900
Total: $
0603Y0630333MET
Knowles
CAP CER 0.033UF 63V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
7200
Total: $
0603Y0630333MDT
Knowles
CAP CER 0.033UF 63V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
0
Total: $
0603Y0630273MET
Knowles
CAP CER 0.027UF 63V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
700
Total: $
0603Y0630273MDT
Knowles
CAP CER 0.027UF 63V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
4400
Total: $
  • 1
  • 3842
  • 3843
  • 3844
  • 3845
  • 3846
  • 6670
Go to