Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
GQM1555C2D180GB01D
Murata
CAP CER 18PF 200V NP0 0402

MPQ: 10000

Lead Time: 9-12Days

-- --
8700
Total: $
GQM1555C2D160GB01D
Murata
CAP CER 16PF 200V NP0 0402

MPQ: 10000

Lead Time: 9-12Days

-- --
2300
Total: $
MAX3886ETN+T
Analog Devices
IC MULTIRATE CDR SER/DES56-TQFN

Lead Time: 9-12Days

-- --
1000
Total: $
GQM1555C2D130GB01D
Murata
CAP CER 13PF 200V NP0 0402

MPQ: 10000

Lead Time: 9-12Days

-- --
5900
Total: $
FPD87352CXAVV/NOPB
Texas Instruments
IC TIMING CTLR TFT-LCD 176-LQFP

Lead Time: 9-12Days

-- --
3300
Total: $
GQM1555C2D120GB01D
Murata
CAP CER 12PF 200V NP0 0402

MPQ: 10000

Lead Time: 9-12Days

-- --
2300
Total: $
CY22800FXI
Infineon
IC PROG CLOCK GEN 8-SOIC

Lead Time: 9-12Days

-- --
8500
Total: $
GQM1555C2D110GB01D
Murata
CAP CER 11PF 200V NP0 0402

MPQ: 10000

Lead Time: 9-12Days

-- --
1500
Total: $
CY22800FXIT
Infineon
IC PROG CLOCK GEN 8-SOIC

Lead Time: 9-12Days

-- --
2400
Total: $
SN75LVDS88BPFDG4
Texas Instruments
IC TFT TIMING CONTROL 100-HTQFP

Lead Time: 9-12Days

-- --
100
Total: $
LD061A471KAB2A\500
Kyocera Avx Components
CAP CER SMD

Lead Time: 9-12Days

-- --
5000
Total: $
TMC57750PM
Texas Instruments
IC DRIVER 5V 64-LQFP

Lead Time: 9-12Days

-- --
2500
Total: $
557G-08LF
Renesas
LOW SKEW CLOCK DRIVER, 557 SERIE

Lead Time: 9-12Days

-- --
9200
Total: $
557GI-08LF
Renesas
IC MUX 2:1 PCI-EXPRESS 16-TSSOP

Lead Time: 9-12Days

-- --
8300
Total: $
557MI-01LF
Renesas
PROCESSOR SPECIFIC CLOCK GENERAT

Lead Time: 9-12Days

-- --
3100
Total: $
C1206C473G4JAC7800
Kemet(Yageo)
CAP CER 0.047UF 16V U2J 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
8900
Total: $
ICS841S02BGILF
Renesas
IC CLK GENERATOR PLL 20-TSSOP

Lead Time: 9-12Days

-- --
7100
Total: $
C1206C103G5JAC7800
Kemet(Yageo)
CAP CER 10000PF 50V U2J 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
3600
Total: $
C1206C439C1GACTU
Kemet(Yageo)
CAP CER 4.3PF 100V C0G/NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
6300
Total: $
843021AGI-01LF
Renesas
IC CLK GEN 1GIG LVPECL 8-TSSOP

Lead Time: 9-12Days

-- --
1000
Total: $
  • 1
  • 3830
  • 3831
  • 3832
  • 3833
  • 3834
  • 6670
Go to