Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BFC237872303
Vishay
CAP FILM 0.03UF 5% 1KVDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
700
Total: $
SI5338N-B05174-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
2600
Total: $
B32926C3335K000
Tdk
CAP FILM 3.3UF 10% 630VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
4900
Total: $
SI5338N-B05182-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
6000
Total: $
MKP385533025JKI2B0
Vishay
CAP FILM 3.3UF 5% 250VDC RADIAL

MPQ: 125

Lead Time: 9-12Days

-- --
9300
Total: $
MKP385533025JKP2T0
Vishay
CAP FILM 3.3UF 5% 250VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
2900
Total: $
SI5338N-B05263-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
7200
Total: $
MKP385533025JKM2T0
Vishay
CAP FILM 3.3UF 5% 250VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
9500
Total: $
SI5338N-B05315-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
8300
Total: $
BFC238344393
Vishay
CAP FILM 0.039UF 5% 1.4KVDC RAD

MPQ: 400

Lead Time: 9-12Days

-- --
6800
Total: $
SI5338N-B05316-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
6400
Total: $
BFC238341393
Vishay
CAP FILM 0.039UF 5% 1.4KVDC RAD

MPQ: 400

Lead Time: 9-12Days

-- --
4300
Total: $
BFC238302474
Vishay
CAP FILM 0.47UF 5% 250VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
9800
Total: $
SI5338N-B05414-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
1400
Total: $
F339MX251031JIP2T0
Vishay
CAP FILM 1UF 5% 630VDC RADIAL

MPQ: 150

Lead Time: 9-12Days

-- --
4900
Total: $
F339MX251031JIM2T0
Vishay
CAP FILM 1UF 5% 630VDC RADIAL

MPQ: 150

Lead Time: 9-12Days

-- --
3000
Total: $
SI5338N-B05519-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
1600
Total: $
F339MX251031JII2B0
Vishay
CAP FILM 1UF 5% 630VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
3200
Total: $
SI5338N-B05552-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
5200
Total: $
C4CAWUC3150AA1J
Kemet(Yageo)
CAP FILM 0.15UF 5% 2KVDC AXIAL

MPQ: 100

Lead Time: 9-12Days

-- --
200
Total: $
  • 1
  • 3805
  • 3806
  • 3807
  • 3808
  • 3809
  • 6670
Go to