Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SI5338B-B04872-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
4800
Total: $
SI5338B-B04973-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
8500
Total: $
MTSW-104-11-T-S-567-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

Lead Time: 9-12Days

-- --
5600
Total: $
MTSW-104-11-T-S-353-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

Lead Time: 9-12Days

-- --
9500
Total: $
SI5338B-B05287-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
4800
Total: $
MTSW-103-24-T-D-240
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2600
Total: $
SI5338B-B05723-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
0
Total: $
SI5338B-B06143-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
6600
Total: $
SI5338B-B06189-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
8500
Total: $
SI5338B-B06190-GM
Skyworks
I2C CONTROL, 4-OUTPUT, ANY FREQU

Lead Time: 9-12Days

-- --
8100
Total: $
MTSW-103-08-G-S-325
Samtec
CONN HEADER VERT 3POS 2.54MM

Lead Time: 9-12Days

-- --
5000
Total: $
MTSW-103-08-G-S-301
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4000
Total: $
MTSW-103-08-G-S-200
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5000
Total: $
MTSW-102-24-L-D-275
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7800
Total: $
MTSW-102-24-H-S-230
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7400
Total: $
MTSW-102-07-T-T-240
Samtec
CONN HEADER VERT 6POS 2.54MM

Lead Time: 9-12Days

-- --
700
Total: $
HTSW-105-07-FM-S
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6000
Total: $
HTSW-103-26-F-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8700
Total: $
HTSW-102-28-T-D
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9500
Total: $
HTSW-102-24-F-D
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5900
Total: $
  • 1
  • 3773
  • 3774
  • 3775
  • 3776
  • 3777
  • 6670
Go to