Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BFC238361203
Vishay
CAP FILM 0.02UF 5% 2KVDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
6100
Total: $
9ZX21501CKLF
Renesas
IC BUFFER 15OUT DIFF Z 64MLF

MPQ: 207

Lead Time: 9-12Days

-- --
3600
Total: $
BFC238360203
Vishay
CAP FILM 0.02UF 5% 2KVDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
1600
Total: $
BFC238304624
Vishay
CAP FILM 0.62UF 5% 250VDC RADIAL

MPQ: 250

Lead Time: 9-12Days

-- --
4100
Total: $
BFC238301624
Vishay
CAP FILM 0.62UF 5% 250VDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
1600
Total: $
932S208DGLFT
Renesas
IC TIMING HUB CTRL PROGR 56TSSOP

Lead Time: 9-12Days

-- --
4500
Total: $
BFC238342303
Vishay
CAP FILM 0.03UF 5% 1.4KVDC RAD

MPQ: 350

Lead Time: 9-12Days

-- --
0
Total: $
B32774P6106K000
Tdk
CAP FILM 10UF 10% 630VDC RADIAL

MPQ: 640

Lead Time: 9-12Days

-- --
8000
Total: $
954206AGLF
Renesas
IC TIMING CTRL HUB P4 56-TSSOP

Lead Time: 9-12Days

-- --
3400
Total: $
MKP385422160JKP2T0
Vishay
CAP FILM 0.22UF 5% 1.6KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
6800
Total: $
9LPRS436CGLF
Renesas
IC CLK SYNTHESIZER 48TSSOP

Lead Time: 9-12Days

-- --
8600
Total: $
MKP385422160JKM2T0
Vishay
CAP FILM 0.22UF 5% 1.6KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
4300
Total: $
953008BFLF
Renesas
IC TIMING CTRL HUB P4 56-SSOP

Lead Time: 9-12Days

-- --
7300
Total: $
F17735102900
Vishay
CAP FILM 1UF 10% 630VDC AXIAL

MPQ: 250

Lead Time: 9-12Days

-- --
6500
Total: $
PI6LC48P0101LIE
Diodes Incorporated
IC CLOCK 625MHZ 1CIR 8TSSOP

MPQ: 100

Lead Time: 9-12Days

-- --
4400
Total: $
BFC233616334
Vishay
CAP FILM 0.33UF 20% 630VDC RAD

MPQ: 125

Lead Time: 9-12Days

-- --
3200
Total: $
MKP1841422104M
Vishay
CAP FILM 0.22UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
0
Total: $
SSTE32882HLBAKG
Renesas
IC REGISTERING CLK DRIVER 176BGA

Lead Time: 9-12Days

-- --
1700
Total: $
MKP1848C54010JK2
Vishay
CAP FILM 4UF 5% 1KVDC RADIAL

MPQ: 80

Lead Time: 9-12Days

-- --
9200
Total: $
BFC237514134
Vishay
CAP FILM 0.13UF 5% 630VDC RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
6800
Total: $
  • 1
  • 3755
  • 3756
  • 3757
  • 3758
  • 3759
  • 6670
Go to