
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
0908143008
| Molex |
CONN HEADER SMD 8POS 1.27MM
| Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
ZL30142GGG2
| Microchip |
IC SONET/SDH SYNCH 64CABGA
| Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
0010311048
| Molex |
CONN HEADER VERT 4POS
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
DS3102GN2
| Microchip |
IC TIMING CARD STRATUM 81CSBGA
| Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
880-70-016-10-001101
| Preci-Dip |
CONN HEADER VERT 16POS 2MM
| MPQ: 990 Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
SI53204-A01AGM
| Skyworks |
IC CLOCK BUFFER
| MPQ: 490 Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
1721731004
| Molex |
CONN HEADER R/A 4POS 3.96MM
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
DF51A-6P-2DS(20)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT
| MPQ: 135 Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
LV5609LP-E
| Onsemi |
IC CLOCK DRIVER VERTICAL 24VCT
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
0022284167
| Molex |
CONN HEADER VERT 16POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
9FGV0641AKILF
| Renesas |
MULTIMKT-TIMING
| MPQ: 490 Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
0022284166
| Molex |
CONN HEADER VERT 16POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
SI53019-A01AGMR
| Skyworks |
IC BUFFER ZDB PCIE 1:19 72QFN
| Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
SI53112-A03AGM
| Skyworks |
1:12 LOW-POWER PCIE FANOUT/ZERO-
| MPQ: 260 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
9DML0451AKILF
| Renesas |
IC CLOCK PCIE 24VFQFPN
| MPQ: 490 Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
647609-5
| Te Connectivity |
CONN HEADER VERT 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
0683002007
| Molex |
CONN HEADER VERT 8POS 2.54MM
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
9FGL0241CKILF
| Renesas |
IC CLK GENERATOR PCIE 24VFQFPN
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
95293-501A08LF
| Amphenol |
BERGSTIK
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
9DB633AGILF
| Renesas |
IC CLK FANOUT/BUFF ZD 28TSSOP
| MPQ: 50 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
|