Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
LQW2UASR91J00L
Murata
910nH----380mA-1.68--10082520-

Lead Time: 9-12Days

-- --
3300
Total: $
LY3205
Lingyang Micro

Lead Time: 9-12Days

-- --
4300
Total: $
FCC0603N300J500CT
Fojan
MLCC 50V ±5% 30pF C0G 0603

Lead Time: 9-12Days

-- --
3500
Total: $
FRC0603F2743TS
Fojan
100mW 274kΩ ±1% 0603

Lead Time: 9-12Days

-- --
8500
Total: $
FCC0603N8R2C500CT
Fojan
MLCC 50V 8.2pF C0G 0603

Lead Time: 9-12Days

-- --
3900
Total: $
FCC0603B203K500CT
Fojan
MLCC 50V ±10% 20nF X7R 0603

Lead Time: 9-12Days

-- --
900
Total: $
FCC0603N0R5C500CT
Fojan
MLCC 50V 0.5pF C0G 0603

Lead Time: 9-12Days

-- --
3100
Total: $
FRC0603F2053TS
Fojan
100mW 205kΩ ±1% 0603

Lead Time: 9-12Days

-- --
6700
Total: $
FRC0603F68R0TS
Fojan
100mW 68Ω ±1% 0603

Lead Time: 9-12Days

-- --
8100
Total: $
FRC0603F7502TS
Fojan
100mW 75kΩ ±1% 0603

Lead Time: 9-12Days

-- --
300
Total: $
FRC0402F6800TS
Fojan
62.5mW 680Ω ±1% 0402

Lead Time: 9-12Days

-- --
4900
Total: $
FRC0402J512 TS
Fojan
62.5mW 5.1kΩ ±5% 0402

Lead Time: 9-12Days

-- --
5100
Total: $
FRC0603F4872TS
Fojan
100mW 48.7kΩ ±1% 0603

Lead Time: 9-12Days

-- --
6700
Total: $
FRC0603F1182TS
Fojan
100mW 11.8kΩ ±1% 0603

Lead Time: 9-12Days

-- --
6900
Total: $
FRC0603F5112TS
Fojan
100mW 51.1kΩ ±1% 0603

Lead Time: 9-12Days

-- --
7100
Total: $
FRC0603F2052TS
Fojan
100mW 20.5kΩ ±1% 0603

Lead Time: 9-12Days

-- --
7700
Total: $
FRC0603F1301TS
Fojan
100mW 1.3kΩ ±1% 0603

Lead Time: 9-12Days

-- --
8300
Total: $
FRC0603F9100TS
Fojan
100mW 910Ω ±1% 0603

Lead Time: 9-12Days

-- --
1900
Total: $
FRC0603F1691TS
Fojan
100mW 1.69kΩ ±1% 0603

Lead Time: 9-12Days

-- --
2900
Total: $
FRC0603F27R0TS
Fojan
100mW 27Ω ±1% 0603

Lead Time: 9-12Days

-- --
4100
Total: $
  • 1
  • 35
  • 36
  • 37
  • 38
  • 39
  • 6854
Go to