
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
932SQ420DKLF
| Renesas |
IC CLOCK SYNTHESIZER 64QFN
| MPQ: 207 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
AD9577BCPZ
| Analog Devices |
IC CLK GEN PLL DUAL 40LFCSP
| MPQ: 83 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
TSW-103-14-F-S-LL
| Samtec |
CONN HEADER VERT 3POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
929647-01-01-I
| 3M |
CONN HEADER VERT 1POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
961105-6804-AR
| 3M |
CONN HEADER VERT 5POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
AD9523BCPZ
| Analog Devices |
IC INTEGER-N CLCK GEN 72LFCSP
| MPQ: 43 Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
75867-332LF
| Amphenol |
CONN HEADER R/A 8POS 2.54MM
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
929838-04-03-RK
| 3M |
CONN HEADER R/A 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
ADF4169CCPZ
| Analog Devices |
IC PLL FREQ SYNTHESIZER 24LFCSP
| MPQ: 42 Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
929838-02-03-RK
| 3M |
CONN HEADER R/A 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
PEC03SFDN
| Sullins Connector Solutions |
CONN HEADER VERT 3POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
AD9547BCPZ
| Analog Devices |
IC CLOCK GEN/SYNCHRONIZR 64LFCSP
| MPQ: 27 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
82P33814ANLG
| Renesas |
MOD SMU IEEE 1588 ETH 72VFQFPN
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
929647-07-01-I
| 3M |
CONN HEADER VERT 1POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
929647-05-01-I
| 3M |
CONN HEADER VERT 1POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
ADN2818ACPZ
| Analog Devices |
IC CLOCK/DATA RECOVERY 32-LFCSP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
929647-03-01-I
| 3M |
CONN HEADER VERT 1POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
ZL30121GGG2V2
| Microchip |
IC SONET/SDH SYNCH 100CABGA
| MPQ: 260 Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
LV5609LP-TE-L-E
| Onsemi |
IC CLOCK DRIVER VERT VCT24
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
929647-02-01-I
| 3M |
CONN HEADER VERT 1POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 8400 | Total:
$
|