Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
V23818-M305-B57
Infineon
TXRX ETHRNET MULT-MODE 1.25GBIT

Lead Time: 9-12Days

-- --
700
Total: $
V23818-K305-L57
Infineon
TXRX ETHRNET MULT-MODE 1.25GBIT

Lead Time: 9-12Days

-- --
400
Total: $
BFC237864124
Vishay
CAP FILM 0.12UF 5% 630VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
9200
Total: $
V23818-K305-B57
Infineon
TXRX ETHRNET MULT-MODE 1.25GBIT

Lead Time: 9-12Days

-- --
1200
Total: $
V23826-C18-C63
Infineon
TXRX SINGLE MODE 155MBD 1X9

Lead Time: 9-12Days

-- --
5500
Total: $
BFC237862124
Vishay
CAP FILM 0.12UF 5% 630VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
5700
Total: $
V23826-C18-C366
Infineon
TXRX SGL MODE 155MBD 1X9 EXT TMP

Lead Time: 9-12Days

-- --
4000
Total: $
MKP1848S57010JP2B
Vishay
CAP FILM 7UF 5% 1KVDC RADIAL

MPQ: 56

Lead Time: 9-12Days

-- --
5300
Total: $
V23826-C18-C64
Infineon
TXRX SINGLE MODE 155MBD 1X9

Lead Time: 9-12Days

-- --
9500
Total: $
MKP1839468124HQR
Vishay
CAP FILM 0.68UF 5% 1.25KVDC AXL

MPQ: 225

Lead Time: 9-12Days

-- --
3600
Total: $
V23826-K305-C63
Infineon
TXRX MULT-MODE 850NM 1.3GBIT

Lead Time: 9-12Days

-- --
2500
Total: $
MKP385475085JKP2T0
Vishay
CAP FILM 0.75UF 5% 850VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
8100
Total: $
V23826-K305-C53C3
Infineon
TXRX MULT-MODE 850NM 1.3GBIT

Lead Time: 9-12Days

-- --
1400
Total: $
MKP385475085JKM2T0
Vishay
CAP FILM 0.75UF 5% 850VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
2600
Total: $
V23826-K305-C53
Infineon
TXRX MULT-MODE 850NM 1.3GBIT

Lead Time: 9-12Days

-- --
9700
Total: $
V23826-K305-C373
Infineon
TXRX MULT-MODE 850NM 1.3GBIT

Lead Time: 9-12Days

-- --
9600
Total: $
MKP385475085JKI2B0
Vishay
CAP FILM 0.75UF 5% 850VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
4100
Total: $
V23826-K305-C353D3
Infineon
TXRX MULT-MODE 850NM 1.3GBIT

Lead Time: 9-12Days

-- --
9500
Total: $
V23826-K305-C363
Infineon
TXRX MULT-MODE 850NM 1.3GBIT

Lead Time: 9-12Days

-- --
6600
Total: $
F1778510M3ICT0
Vishay
CAP FILM 1UF 20% 630VDC RADIAL

MPQ: 135

Lead Time: 9-12Days

-- --
2500
Total: $
  • 1
  • 3615
  • 3616
  • 3617
  • 3618
  • 3619
  • 6670
Go to