Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
0805J5001P50DFT
Knowles
CAP CER 1.5PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
5900
Total: $
HDSP-7513-CD000
Broadcom(Avago)
DISPLAY 7-SEG 0.3" SGL RED 10DIP

Lead Time: 9-12Days

-- --
7700
Total: $
0805J5001P50DAT
Knowles
CAP CER 1.5PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
3500
Total: $
0805J5001P20DFT
Knowles
CAP CER 1.2PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
8200
Total: $
HDSP-3600
Broadcom(Avago)
DISPLAY 7SEG 0.3" SGL GRN 14DIP

Lead Time: 9-12Days

-- --
4300
Total: $
0805J5001P20DAT
Knowles
CAP CER 1.2PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
7400
Total: $
HDSP-H211
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL RED 10DIP

MPQ: 320

Lead Time: 9-12Days

-- --
5800
Total: $
HDSP-H213
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
1900
Total: $
HDSP-H413
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL ORG 10DIP

Lead Time: 9-12Days

-- --
4900
Total: $
0805J5001P00DFT
Knowles
CAP CER 1PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
7600
Total: $
HDSP-F511
Broadcom(Avago)
DISPLAY 7SEG 0.4" SGL GRN 10DIP

MPQ: 200

Lead Time: 9-12Days

-- --
4500
Total: $
0805J5001P00DAT
Knowles
CAP CER 1PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
6400
Total: $
HDSP-F513
Broadcom(Avago)
DISPLAY 7SEG 0.4" SGL GRN 10DIP

Lead Time: 9-12Days

-- --
6900
Total: $
HDSP-5703-GH000
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL YLW 10DIP

Lead Time: 9-12Days

-- --
8400
Total: $
0805J5000821MDT
Knowles
CAP CER 820PF 500V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
3500
Total: $
HDSP-5701-GH000
Broadcom(Avago)
DISPLAY 7SEG 0.56" SGL YLW 10DIP

Lead Time: 9-12Days

-- --
9800
Total: $
0805J5000821KDT
Knowles
CAP CER 820PF 500V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
6900
Total: $
HDSP-5507
Broadcom(Avago)
DISP 7SEG 0.56" OV/FL RED 10DIP

Lead Time: 9-12Days

-- --
7900
Total: $
0805J5000820KFT
Knowles
CAP CER 82PF 500V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
1500
Total: $
HDSP-U203-CD000
Broadcom(Avago)
DISPLAY 7SEG 0.31" SGL RED 10DIP

Lead Time: 9-12Days

-- --
2700
Total: $
  • 1
  • 3576
  • 3577
  • 3578
  • 3579
  • 3580
  • 6670
Go to